My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
333
>
2900 - Site Mitigation Program
>
PR0545445
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2020 4:40:31 PM
Creation date
3/3/2020 4:20:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0545445
PE
2961
FACILITY_ID
FA0025798
FACILITY_NAME
CALIFORNIA ARMY NATIONAL GUARD
STREET_NUMBER
333
Direction
N
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04123045
CURRENT_STATUS
02
SITE_LOCATION
333 N WASHINGTON ST
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
699
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APP/SSHP <br /> Soil Excavation at California National Guard Armory <br /> Lodi, California <br /> 11.0 PERSONAL HYGIENE AND DECONTAMINATION <br /> 11.1 GENERAL <br /> At the end of a daily shift and whenever leaving the work area where contact with hazardous <br /> chemical has been a possibility or personnel have been working in established EZs, all <br /> personnel will be required to remove protective equipment and discard disposable garments. All <br /> wash water will be containerized for proper handling and disposal. At the end of the shift, all <br /> personnel will clean themselves and change into clean clothes, if necessary, before leaving the <br /> site. <br /> 11.2 DONNING AND DOFFING PERSONAL PROTECTIVE EQUIPMENT <br /> The following procedures will be followed for putting on PPE (when required): <br /> • All employees working in the EZ will have PPE available as described in Section 6.2, <br /> Modified Level D. <br /> • All employees will be trained in the use of any PPE necessary to perform their duties. <br /> • If protective suits, boots, and gloves are prescribed by the SSHO, employees shall tape <br /> the gloves and boots to the protective suit to prevent contamination from penetrating the <br /> space between the protective suit and the gloves and boots. <br /> • If respirators are prescribed by the SSHO, the respirators will be thoroughly inspected <br /> prior to donning the respirator. New cartridges will be installed. A positive/negative fit <br /> check shall be performed each time the respirator is donned. <br /> The following procedures will be followed for removal of PPE (when required): <br /> • Before leaving the work area, knock off all heavy soil from gloves and boots. <br /> • Proceed to the hot line personnel decontamination pad. Step into the boot wash station, <br /> wash gloves and boots, and wipe off the respirator if necessary. <br /> • After leaving the boot wash station, remove outer tape, boots and gloves. Throw tape <br /> and gloves away in designated containers. <br /> • Remove outer boots and hang them on the boot rack (respirator still on). <br /> • Proceed to remove the outer suit and place in the designated container. <br /> • Remove inner boot liners and outer gloves and throw away in the designated container. <br /> • Once clear of decon. station, using inner gloves, remove respirator (if used) and throw <br /> cartridges into the designated container (throw cartridges away at the end of shift). <br /> • Wash respirator, then remove inner gloves, and throw into the designated container. <br /> • Hang up the respirator to dry (towel dry and bag at the end of shift). <br /> 11.2.1 Personal Hygiene/Sanitation <br /> • A portable bathroom and wash facility will be provided at the site, if necessary. <br /> • At the end of a daily shift and whenever leaving the a work area where contact with <br /> hazardous chemical has been a possibility or personnel have been working in <br /> established EZs, all personnel will be required to remove protective equipment and <br /> discard disposable garments. All wash water will be containerized for proper handling <br /> OTIE 36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.