My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
333
>
2900 - Site Mitigation Program
>
PR0545445
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2020 4:40:31 PM
Creation date
3/3/2020 4:20:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0545445
PE
2961
FACILITY_ID
FA0025798
FACILITY_NAME
CALIFORNIA ARMY NATIONAL GUARD
STREET_NUMBER
333
Direction
N
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04123045
CURRENT_STATUS
02
SITE_LOCATION
333 N WASHINGTON ST
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
699
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APP/SSHP <br /> Soil Excavation at California National Guard Armory <br /> Lodi, California <br /> Table 7. Emergency Horn Signals <br /> NUMBER OF HORN RESPONSE <br /> BLASTS <br /> 1 Power equipment shut down <br /> Await further instruction <br /> 2 Injured person <br /> Notify supervisor and SSHO immediately <br /> Begin appropriate medical treatment as necessary <br /> 3 Evacuation from a work area (radio <br /> (followed by a continuous communications will then be used to determine <br /> long blast) need for site evacuation after a head count is <br /> passed among safe sites) <br /> 14.5 EVACUATION PLAN <br /> Specific plans for evacuation from the site will vary depending on the phase of the work being <br /> performed and the location. Safe meeting areas after site evacuation will vary depending on the <br /> work phase. They will be indicated on the site maps maintained in the field and will be <br /> discussed during daily safety meetings. All site personnel and visitors will be informed of the <br /> evacuation plan and meeting places during site orientation. <br /> Upon hearing the evacuation signal (three horn blasts followed by one continuous blast), <br /> employees will check the surroundings to determine wind direction. Whenever possible, <br /> evacuation should be in the direction perpendicular to the wind direction without passing <br /> through the plume or smoke cloud, if any. Emergency egress points will be on the site map <br /> maintained in the field and discussed in the site-specific orientation with all employees and <br /> visitors. <br /> Each site supervisor not involved in response activities will account for employees within his/her <br /> charge at the meeting area and report the information to the SSHO. The SSHO will check the <br /> supervisor's lists against the sign-in log and will notify the PM of any discrepancies. <br /> Figure 4 shows the evacuation routes from the two main work locations along with the hospital <br /> route map as Figure 3. <br /> 14.6 EMERGENCY PREVENTION, RECOGNITION AND RESPONSE <br /> 14.6.1 General <br /> Site personnel and visitors will be instructed in the recognition of site emergencies and their <br /> duties in notification/warning. <br /> Prevention - The provisions of the APP/SSHP/AHAs will be followed to prevent employee injury <br /> and illness. <br /> OTIE 45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.