Laserfiche WebLink
APP/SSHP <br /> Soil Excavation at California National Guard Armory <br /> Lodi, California <br /> Response— Response to an environmental release will involve cessation of operations, <br /> notification of the contracting officer and appropriate federal, state and local agencies, and <br /> implementing the appropriate spill or dust control plans. For air releases, off-site evacuation will <br /> be the responsibility of local authorities after notification by the PM. <br /> 14.9 MISCELLANEOUS <br /> Prevention — OTIE will take reasonable measures to secure the site and site employees <br /> against other events such as severe weather conditions and adverse community activity. Such <br /> preventive measures will include securing temporary office and storage facilities, grounding of <br /> buildings and electrical systems, and implementation of a security plan. <br /> Recognition —Any forecasts of severe weather conditions or indications of adverse community <br /> activities (e.g., threats, vandalism, pickets, etc.) will be reported immediately to the PM. <br /> Response—All outdoor work will cease during lightning in the area. The safety of work in high <br /> winds or other severe weather conditions will be assessed by the SSHO. Any decision to cease <br /> operations will be reviewed by the activity POC: Byron Clamor. OTIE will not respond to any <br /> adverse community situation other than to try to obtain as much information as possible and to <br /> report that information to the activity POC, or in the event of an emergency, to the local <br /> authorities. <br /> 14.10 INCIDENT REPORTING <br /> OTIE will follow the corporate incident reporting procedure detailed in Section 4.0: Accident and <br /> Crisis Management Program of the OTIE Corporate Safety and Health Manual. In addition, the <br /> client will be notified of all incidents covered by this section immediately, and will receive copies <br /> of any IRs within 24 hours. Appendix H contains Accident Investigation forms. <br /> A "Lessons Learned" of the incident will be developed by the SSHO and SHM to be used by the <br /> project team in order to prevent recurrences of the incident in the future. <br /> 14.11 DAILY PRE-WORK MEETINGS <br /> The daily pre-work meeting is designed as a briefing that addresses the hazards specific to <br /> each day's work activities. The SSHO will address any concerns or potentially dangerous <br /> situations, prior to the start of each workday, in order to prepare the emergency situations and <br /> prevent worker injuries (see Daily Tailgate Safety Meeting Form). These meetings will generally <br /> include the following information: <br /> • Weather report; <br /> • Work plan; <br /> • Levels of PPE for each task to be undertaken; <br /> • Special hazards and environmental issues which may arise from new tasks, and <br /> • Correction of health and safety violations. <br /> OTIE 48 <br />