My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
2401
>
2900 - Site Mitigation Program
>
PR0009269
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2020 4:47:12 PM
Creation date
3/3/2020 4:38:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009269
PE
2960
FACILITY_ID
FA0004006
FACILITY_NAME
LEPRINO FOODS
STREET_NUMBER
2401
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21307050
CURRENT_STATUS
01
SITE_LOCATION
2401 S MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y <br /> i <br /> Page 2 <br /> • Product recovery will be accomplished using approximately 4 of the following <br /> wells; EW-1, MW-1, MW-3, MW4, MW-12 and EW-2. <br /> • An 8-hour step drawdown pump test would be conducted in monitoring well <br /> MW-7. The aquifer testing would only be conducted for 8 hours in an attempt <br /> to not cause the migration of contaminated groundwater towards the well and <br /> to limit the amount of waste generated. <br /> In accordance with your request, we are also submitting this approximate timeline for the <br /> implementation of the proposed interim free product recovery at the above-referenced site. <br /> The proposed timeline would be as follows: <br /> APPROXIMATELY THE WEEK ENDING MILESTONE <br /> 2/10/95 Weekly bailing of free product and drill <br /> MW-14 (for possible future free product <br /> extraction) and MW-15 near the western <br /> site boundary (for groundwater monitoring). <br /> 2/17/95 Develop MW-14 and MW-15. <br /> 2-17-95 Weekly bailing of free product. <br /> 2/24/95 Quarterly sampling of EW-1, EW-2 and <br /> MW-1 through MW-14 and bailing of free <br /> product for the last anticipated time. <br /> 3-3-95 Start field testing of Ejector Systems <br /> product recovery of EW-1,MW-1,MW-3, <br /> MW-4, MW-12 and MW-14 (time <br /> dependent on availability of Ejector <br /> Systems equipment and poly tank). <br /> 3-10-95 Begin product recovery using <br /> approximately 4 of the following wells: <br /> EW-1, MW-1, MW-3, MW4, MW-12 and <br /> MW-14 (time dependent on availability of <br /> Ejector Systems equipment and poly tank). <br /> 3-17-95 Begin groundwater pump testing of MW-7. <br />
The URL can be used to link to this page
Your browser does not support the video tag.