My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
2401
>
2900 - Site Mitigation Program
>
PR0009269
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2020 4:47:12 PM
Creation date
3/3/2020 4:38:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009269
PE
2960
FACILITY_ID
FA0004006
FACILITY_NAME
LEPRINO FOODS
STREET_NUMBER
2401
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21307050
CURRENT_STATUS
01
SITE_LOCATION
2401 S MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rLb— 6—a5 wtv tu:.Jj nit tivrrLullc HiX NU 2UUU48UU21 K02/06 <br /> s . • <br /> KLEIN UHDER -- <br /> File No.24-2.7.0176-1-00 <br /> February 7, 1995 <br /> Ms.Mary F.Mcays, R-E.H.S. <br /> Public Health Services <br /> Environmental health Division <br /> P.O.Box 2009 <br /> Stockton,California 95201-2009 <br /> RE: Approximate Timeline <br /> lnterim Free Product Recovery <br /> Leprino Foods Facility <br /> 2401 MacAribur Drive <br /> Tracy,California <br /> Door Ms. Meays: <br /> Mcinfelder has recently met with the The California Regional Water Quality Central Board,Central Valley <br /> Region(RWQCB). An approximate timeline has been established and given to the RWQCB in an attempt <br /> to comply with their Clean-up and Abatement Order No.94-0704 issued to Leprino Foods. Kleinfelder has <br /> a relatively full field schedule in the upcoming months and would like to begin implementation of the work <br /> as soon as passible so that the requested remediation system will be operational within the time-frame of <br /> the Clean-up and Abatument Order. Our timeline initially included installation of one extraction well and <br /> monitoring well during the week ending on February 10, 1995. Klelnfelder has rescheduled this work for <br /> the week ending on February 17, 1995. That should allow you adequate time to review the attached scope <br /> of work and tentative ziuteline detailed in the Leprino letter. If there are any questions,please feel free to <br /> contact its. <br /> Respectfully submitted, <br /> KIXINFIdLDER,INC. <br /> AANA <br /> Robert"Tony" Martin, R-E.A. <br /> Seniors Geologist <br /> Bruce R-Milan,R.G.,C.E.G.,R.E.A- <br /> Senior Project Manager <br /> Attacment <br /> cc: Mr.Roy Greeograes Mr.Patrick Morris <br /> Leprino Foods State of California <br /> 2401 MacArthur Drive Regional Water Quality Control <br /> Tracy. alifornis95378 Board Central Valley Region <br /> 3443 Routicr Road,Suite A <br /> Mr.John Ewing Sacramento,California 95827.3098 <br /> Leprino Foods <br /> Post OTiice Box 173400 <br /> Dwvcr,Colorado 80317-3500 <br /> DlLmd 1,3795 Page 1 of 1 <br /> Copyright 1993, KleinJolder.Inc. <br /> KLEINFELDER 1077 Fite Circir, Sacramento, CA 95827 (91613(A-1701 <br />
The URL can be used to link to this page
Your browser does not support the video tag.