Laserfiche WebLink
Item 7 There was an error in Attachment A Kleinfelder Field Protocol. A fourth well is <br /> not proposed at this time and 4-inch casing will not be used. The three <br /> monitoring wells proposed at this time will be constructed with 2-inch casing. <br /> Item 8 Any product layer will be measured and reported. <br /> Kleinfelder anticipates that the field work will be started within two weeks of receiving <br /> approved boring permits from San Joaquin County (sometime in October 1993). The report of <br /> findings will include an evaluation of the extent of soil and groundwater contamination, a <br /> proposal for additional site characterization if needed and evaluation of the interim remediation <br /> system capture zone. <br /> Leprino Foods is preparing the work plan for the interim groundwater extraction and treatment <br /> system. <br /> If you have any questions or need additional information, please do not hesitate to contact me. <br /> Sincerely, <br /> 7KLELDER, C <br /> dlay, R.G. <br /> Senior Geologist <br /> ESF:ssm <br /> cc: Mr. John Ewing, Leprino Foods <br /> Ms. Mary Ways, San Joaquin County Public Health Service <br /> Environmental Health Division <br /> 24-220176-D00/FL6-112 (1993) Page 2 of 2 September 29, 1993 <br /> Copyright 1993 Kteinfetder, Inc. <br /> KLEINFELDER 3077 Fite Circle, Sacramento, CA 95827 (916) 366-1701 <br />