My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
2401
>
2900 - Site Mitigation Program
>
PR0009269
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2020 4:42:28 PM
Creation date
3/3/2020 4:40:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009269
PE
2960
FACILITY_ID
FA0004006
FACILITY_NAME
LEPRINO FOODS
STREET_NUMBER
2401
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21307050
CURRENT_STATUS
01
SITE_LOCATION
2401 S MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table of Contents <br /> 1.0 INTRODUCTION.............................................................................................................. 1 <br /> 2.0 SITE CONDITIONS AND EXISTING REMEDIATION SYSTEMS..............................2 <br /> 2.1 Present Site Conditions ...................................................................................................2 <br /> 2.2 Existing Remediation Systems .......................................................................................3 <br /> 3.0 SELECTED REMEDIATION ENHANCEMENT DESCRIPTION.................................5 <br /> 3.1 Cleanup Approach...........................................................................................................5 <br /> 3.1.lAddi tional Characterization....................................................................................5 <br /> 3.1.2P base 2 - Containment of Impacts and Initial Product Recovery...........................5 <br /> 3.1.3P base 3—Enhanced Product Recovery....................................................................6 <br /> 3.1.4P base 4- Dissolved Phase Remediation.................................................................7 <br /> 3.1.5P base 5 —Monitoring,Reporting and Site Closure.................................................7 <br /> 4.0 IMPLEMENTATION SCHEDULE...................................................................................8 <br /> Figures <br /> Figure 1 Site Map With Well Locations <br /> Figure 2 Piezometric Surface, December 2004 <br /> Figure 3 Measured Free-Phase Thickness with Dissolved Diesel Concentrations, December <br /> 2004 <br /> Figure 4 Proposed new Recovery Well Locations <br /> Figure 5 Cleanup Plan Implementation Scehdule <br /> Appendices <br /> Appendix A Well Installation Procedures <br /> GeoTranB <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.