Laserfiche WebLink
Table of Contents <br /> 1.0 INTRODUCTION.............................................................................................................. 1 <br /> 2.0 SITE CONDITIONS AND EXISTING REMEDIATION SYSTEMS..............................2 <br /> 2.1 Present Site Conditions ...................................................................................................2 <br /> 2.2 Existing Remediation Systems .......................................................................................3 <br /> 3.0 SELECTED REMEDIATION ENHANCEMENT DESCRIPTION.................................5 <br /> 3.1 Cleanup Approach...........................................................................................................5 <br /> 3.1.lAddi tional Characterization....................................................................................5 <br /> 3.1.2P base 2 - Containment of Impacts and Initial Product Recovery...........................5 <br /> 3.1.3P base 3—Enhanced Product Recovery....................................................................6 <br /> 3.1.4P base 4- Dissolved Phase Remediation.................................................................7 <br /> 3.1.5P base 5 —Monitoring,Reporting and Site Closure.................................................7 <br /> 4.0 IMPLEMENTATION SCHEDULE...................................................................................8 <br /> Figures <br /> Figure 1 Site Map With Well Locations <br /> Figure 2 Piezometric Surface, December 2004 <br /> Figure 3 Measured Free-Phase Thickness with Dissolved Diesel Concentrations, December <br /> 2004 <br /> Figure 4 Proposed new Recovery Well Locations <br /> Figure 5 Cleanup Plan Implementation Scehdule <br /> Appendices <br /> Appendix A Well Installation Procedures <br /> GeoTranB <br /> 1 <br />