My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
27383
>
2900 - Site Mitigation Program
>
PR0004192
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2020 4:48:07 PM
Creation date
3/3/2020 4:44:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0004192
PE
2951
FACILITY_ID
FA0004007
FACILITY_NAME
GLENBRIAR ESTATES/L T PEREIRA
STREET_NUMBER
27383
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
24804003
CURRENT_STATUS
02
SITE_LOCATION
27383 S MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AMERICAN <br /> ENVIRONMENTAL MANAGEMENT CORP. <br /> Please Refer To: <br /> AEMC Job No. 82472 <br /> 14 November 1991 <br /> tl . . <br /> Mr. Michael Infurna <br /> Environmental Health Division <br /> San Joaquin County Y �N! <br /> 1601 East Hazelton Avenue Pyr'.`j''"'-�!`' '-"t 1€;n 2;H <br /> Stockton, California 95201 ri v,PT/ CF VtC�-' <br /> RE: SOIL REMEDIATION AT GLENBRIAR ESTATES <br /> TRACY, CALIFORNIA <br /> Dear Mr. Infurna: <br /> Please find enclosed an Executive Summary for the proposed soil remediation at <br /> 27383 South MacArthur Road in Tracy, California. Also enclosed is a second copy of the <br /> Soil Remediation Proposal (SRP). <br /> Per our telephone conversation of 12 November 1991,you will be sending a letter to <br /> Homestead Land Development Corporation stating your conclusions as to the Phase Ii <br /> investigation and the SRP. <br /> AEMC will be looking forward to hearing from you in regards to scheduling for the <br /> excavation work to be done. <br /> If you have any questions, please call. <br /> Sincerely, <br /> Mary E. Long eil H. Zikef se, R. ., C.E.G. 398 <br /> Geologist Geological Science Section Manager <br /> Engineering Division Engineering Division <br /> ML/j ap <br /> 11hld-11(ml-5) <br /> Enclosures <br /> 9719 Lincoln Village Drive,Suite 501,Sacramento CA 95827 I(916)364-8872 <br />
The URL can be used to link to this page
Your browser does not support the video tag.