My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011708
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
27383
>
2900 - Site Mitigation Program
>
PR0004192
>
ARCHIVED REPORTS_XR0011708
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2020 7:19:24 PM
Creation date
3/3/2020 4:48:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011708
RECORD_ID
PR0004192
PE
2951
FACILITY_ID
FA0004007
FACILITY_NAME
GLENBRIAR ESTATES/L T PEREIRA
STREET_NUMBER
27383
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
24804003
CURRENT_STATUS
02
SITE_LOCATION
27383 S MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> E HeM loads, vibration, rain. groundwater and failure to position the spoils <br /> pile at least 2 feet back from the excavation are all situations that could <br /> create hazards in an excavation <br /> 5 Employees must be familiar with Cal/OSHA's bask requirements for <br /> • excavations, trenches and earthwork <br /> 6 A fence or other suitable barricade must be placed around the excavation to <br /> prevent persons from falling into the excavation while the site is unsupervised <br /> • <br /> 7 The Project Manager or other AEMC qualified person must ensure that the <br /> entire excavation is properly sloped Periodic inspection must be made to ensure <br /> the required slope is maintained <br /> Unless soil testing shows that steeper sloping to a maximum of <br /> ' 3/4 1 (horizontal vertical) (53°) is safe, the recommended slope of the excavation <br /> should be 11 (45°) to 1k 1 (34°) The route of egress must be sloped at 2 1 (27°) <br /> or Jess, or a ladder must be used <br /> • <br /> • <br /> • <br /> rzb]a io(MI s) Page 10 <br /> • AMERICAN <br />
The URL can be used to link to this page
Your browser does not support the video tag.