My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0013096
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
245
>
2900 - Site Mitigation Program
>
PR0009285
>
ARCHIVED REPORTS_XR0013096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2020 8:50:35 AM
Creation date
3/4/2020 8:26:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0013096
RECORD_ID
PR0009285
PE
2950
FACILITY_ID
FA0004092
FACILITY_NAME
LATHROP CITY OF
STREET_NUMBER
245
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
195 260 05
CURRENT_STATUS
01
SITE_LOCATION
245 E LOUISE AVE
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> WHF ENVIRONMENTAL C <br /> ONSULTANTS, INC. <br /> - . ' Health & Safety Play <br /> 1.0 HEALTH AND SAFETY PLAN <br /> L. WHF Environmental Consultants, Inc., has adopted the following health and safety <br /> procedures .for working with organic vapors and liquid contaminants encountered <br /> during drilling and excavation of subsurface soil. Thepurpose of this program is to <br /> provide health and safety precautions for the initial and subsequent site visits until the <br /> nature and magnitude of the contaminants have been defined. <br /> 1.1 Personnel Responsibiliiies <br /> All personnel. assigned or involved with the remedial investigation or site clean <br /> P g g <br /> ups will have an assigned responsibility. The outlined .responsibilities will esta- <br /> Wish standards.for personnel protective wear, safety procedures and provide for <br /> emergency actions which could arise during project operations. <br /> 1.2 Profed Manager (PAI) <br /> The Project Manager. directs 2,11 project operations. Project Manager (PM), .in <br /> cooperation with. the Project Safety Officer (PSO), has the primary responsi- <br /> bili.ty for ensuring that Clic safety plan is read, signed, anal fully understood by <br /> all employees and outside persons allowed around or within designated working <br /> perimeters of the job site. <br /> In cooperation with the PSO he is responsible for ensuring that at all times <br /> Pe Po g <br /> during project operations, all employees adhere strictly to the Health and Safety <br /> Plan. <br /> 1.3 Project Safety Officer (PSO) I <br /> The PSO shall direct and ensure that all employees comply with the Health and <br /> Safety Plan. The PSO has the primary responsibility for: <br /> 1. Assuring that appropriate personnel protective equipment is available and <br /> properly utilized by all on-site personnel. ; <br />
The URL can be used to link to this page
Your browser does not support the video tag.