My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0013096
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
245
>
2900 - Site Mitigation Program
>
PR0009285
>
ARCHIVED REPORTS_XR0013096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2020 8:50:35 AM
Creation date
3/4/2020 8:26:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0013096
RECORD_ID
PR0009285
PE
2950
FACILITY_ID
FA0004092
FACILITY_NAME
LATHROP CITY OF
STREET_NUMBER
245
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
195 260 05
CURRENT_STATUS
01
SITE_LOCATION
245 E LOUISE AVE
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WHF Environmental Consultants, Inc. <br /> Health & Safety Plan <br /> Page: 2 <br /> 2. Assuring that personnel are aware of the provisions of this plan, are <br /> instructed in the work practices necessary to ensure safety, and in <br /> planned procedures for dealing with emergencies. 6 <br /> 3. Assuringthat personnel are aware of the potential hazards associated <br /> Pe <br /> with site operations. <br /> 4. Monitoringh safety performance 1 <br /> the ety pe ormance of all personnel to ensure that the .� <br /> required work practices are employed. <br /> 5. Correcting any work practices or conditions that may result in injury or <br /> exposure to hazardous substances. <br /> 6. Preparing any accident/incident reports (see attached Accident Report <br /> ' Form). <br /> 1.4 Project Employee <br /> Project Employees involved in on-site investigations are responsible for: <br /> 1. Takia all reasonable precautions to prevent injury to themselves and to <br /> Taking P J , <br /> their fellow employees. <br /> 2. Implementing Health and Safety Program and reporthig to the PSO for <br /> any action deviating from the anticipated conditions described in the <br /> Health and Safety Plan. <br /> LS Special instructions <br /> It is the responsibility of the Project Manager and the Healflo and -Safety <br /> Manager to review the available site information to determine, to what degree <br /> the Health and Safety Plan will be implemented. Each site will be handled on a <br /> case-by-case basis. <br />
The URL can be used to link to this page
Your browser does not support the video tag.