Laserfiche WebLink
i+J'ILF Environmental Consultants, Inc. <br /> Health & Safety Plan : <br /> Page: 3 mi <br /> 2,0 SAFETYIMPLEMENTATION <br /> The provisions of the WHF Environmental Consultants, Jac. Health and Safety Plan <br /> are mandatory for all personnel associated with the site project and operations. <br /> A complete background review and site visitation will be conducted in order to deter- <br /> mine whether specific amendments are to be made to the'Realth and Safety Plan based <br /> on specific characteristics which may exist on .the job site. Any suspected hazards <br /> associated with the on-site operation. which exposure to, via inhalation or skin absorp- <br /> tion, to such as suspected carcinogens or human sterilants, will be documented and <br /> specific guidance will be developed and added to this Health and Safety Plan as <br /> Ap,-elidices. i. <br /> A defined project site layout is paramount to the safe completion of all reiriedial site in- <br /> vestigadons. The project site layout has built-in safety features. The site is divided into <br /> three 4ones. The following list defines the required personnel protective equipment. <br /> 1.1 Personnel Protective Equipment (PPE) !' <br /> Personnel w.b.o will be working in or around the exclusion zone -of the jou site <br /> will use the following protective equipment and measures as waiTant by the <br /> Project Manager: <br /> - Coveralls as an undergarment <br /> - Saranex outer garment <br /> - Sample gloves (inner) <br /> PVC, Nitrile or Neoprene outer gloves <br /> Hard hat <br /> - Steel toe boots <br /> - Robars or Tingley boots <br /> - - Full face-piece respirator with R53HE cartridges (a combination of <br /> organic vapor, acid gas, pesticide, radionuclide, high efficiency filter). <br /> Note that cartridges should be changed daily. <br /> All joints to be taped <br /> - Self-contained air will be utilized if project dictates <br /> ' I` <br />