My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
24500
>
2900 - Site Mitigation Program
>
PR0505329
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2020 8:39:34 AM
Creation date
3/4/2020 8:38:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505329
PE
2950
FACILITY_ID
FA0006715
FACILITY_NAME
TRACY COLD STORAGE INC
STREET_NUMBER
24500
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
953780420
APN
25024001
CURRENT_STATUS
02
SITE_LOCATION
24500 S MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2-1 <br /> 2.0 INVESTIGATION METHODOLOGY <br /> -" The following sections of this chapter describe the work that will be completed for the Phase <br /> II investigation at the Tracy facility. <br /> 2.1 TASK 1 - HEALTH AND SAFETY PLAN DEVELOPMENT <br /> Remcor will prepare and follow a HASP that describes the program to be implemented dur- <br /> ing the investigation activities at the TCS, Inc. facility. The site-specific HASP will be in- <br /> corporated into the Work Plan. The objective of the plan will be to provide site-specific pro- <br /> cedures to protect the health and to ensure the safety of Remcor personnel during the site <br /> work. Work will be performed in accordance with applicable federal, state, and local regula- <br /> tions, including Occupational Safety and Health Administration (OSHA) 29 Code of Federal <br /> Regulations 1910 and 1926 (29 CFR 1910 and 1926). <br /> Health and safety practices, procedures, and personal protective equipment (PPE) chosen for <br /> the project work will be based on an assessment of hazards at the site using existing site <br /> data. The HASP, the level of protective procedures and practices will be continuously re- <br /> evaluated during the performance of site activities to provide a safe working environment. <br /> All protective measures employed are commensurate with hazards associated with specific <br /> work activities and job tasks. <br /> 2.2 TASK 2 - MOBILIZATION/DEMOBILIZATION <br /> Upon approval of this Work Plan by Southeastern, Remcor will mobilize a field team to the <br /> Tracy, California site to complete the field tasks associated with this project. The field team <br /> will consist of a geologist and a subcontracted drilling fium with a drill rig capable of ad- <br /> vancing hollow-stem augers and collecting split-barrel samples. Prior to any drilling activi- <br /> ties, local utility companies and plant personnel will be notified so that all underground utili- <br /> ties can be located. It is assumed that site access, electrical power, and water supply will be <br /> arranged by Tracy representatives. <br /> :24447 <br />
The URL can be used to link to this page
Your browser does not support the video tag.