My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004836
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
24500
>
2900 - Site Mitigation Program
>
PR0505329
>
ARCHIVED REPORTS_XR0004836
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2020 9:00:39 AM
Creation date
3/4/2020 8:43:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004836
RECORD_ID
PR0505329
PE
2950
FACILITY_ID
FA0006715
FACILITY_NAME
TRACY COLD STORAGE INC
STREET_NUMBER
24500
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
953780420
APN
25024001
CURRENT_STATUS
02
SITE_LOCATION
24500 S MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.7 Well Installation Procedures <br /> • All wells will be installed by state-licensed drilling companies All Federal, State, and Local <br /> regulations will be followed, including obtaining all required permits <br /> • Monitoring well construction detail will be recorded on a boring/well log form <br /> ' • Bentonite seals/grout will be used for surface seals to prevent surface water/product <br /> infiltration <br /> ' Wells will be installed with locking caps with padlocks, and well boxes set approximately one <br /> inch above grade to prevent surface runoff from entering the well box <br /> • Permanent reference marks will be cut in the casing tops to provide consistent reference <br /> points for fluid level measurements <br /> • All well locations and elevations will be surveyed by a state registered Land Surveyor All <br /> well locations and elevations will be plotted on the site map and entered into the project data <br /> base <br /> • Monitoring wells, piezometers, vapor extraction, injection, observation wells and air s ar in <br /> J P g g <br /> wells will be constructed of threaded PVC or stainless steel casing and screens <br /> • Screen casing, filter pack for monitoring or <br /> remediation wells will be installed through the <br /> hollow stem auger flights under unstable borehole wall conditions When borehole wall <br /> iconditions are stable screen, casing, and filter pack may be installed immediately after removal <br /> of auger flights or drill tooling <br /> ' • Unconsolidated soils and sediments will be drilled with a hollow stem auger, consolidated and <br /> cemented sediments, and bedrock will be drilled with rock bit, tricone, air rotary or other <br /> method depending upon the situation <br /> 3.8 Well Development and Monitoring Procedures <br /> ' • Newly installed monitoring or extraction wells are allowed to set at least 24 hours after <br /> completion Wells are developed by alternately pumping and surging Well development will <br /> continue for at least one hour or until the site geologist determines that the discharge is free <br /> and clear of silts and sediments <br /> ' . Wells will be purged as described in Section 3 3 <br /> i <br /> 1 <br /> American Geological Services, Inc. <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.