Laserfiche WebLink
' • The depth to water and total depth of all wells will be measured prior to sampling Depth <br /> measurements will be made from the permanent mark described in Section 3 7 Depth to <br /> ' water measurements shall be accurate to within 0 01 foot <br /> 3.9 Soil and Waste Water Management Procedures <br /> • All soil cuttings and ground water generated during drilling, well development, purging, and <br /> sampling will be stored on site in bins, drums, or tanks pending analysis, transport, and <br /> disposal as may be required <br /> ' • Uniform Hazardous Waste Manifests or Non-Hazardous Waste Data Forms will accompany <br /> any soil or water transported off site <br /> 1 <br /> 4.0 REPORTING PROCEDURES <br /> ' Strict QA/QC procedures for data entry and management will be utilized on all projects All field <br /> and analytical data entered into data bases or various software applications are verified with the <br /> original field and analytical sheets, and that these entries fall within the range of valid values <br /> Comparison of data to nearby sample intervals, sample duplicates, or sample replicates to ensure <br /> that highly skewed data are noted and qualified during interpretation Standardized procedures <br /> are followed to ensure that only verified and validated data are utilized for interpretation and final <br /> documentation <br /> ' Internal technical peer group reviews of all data and reports are conducted prior to final release of <br /> any reports or documents <br /> 1 <br /> American Geological Services, Inc. <br /> 9 <br />