My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004836
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
24500
>
2900 - Site Mitigation Program
>
PR0505329
>
ARCHIVED REPORTS_XR0004836
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2020 9:00:39 AM
Creation date
3/4/2020 8:43:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004836
RECORD_ID
PR0505329
PE
2950
FACILITY_ID
FA0006715
FACILITY_NAME
TRACY COLD STORAGE INC
STREET_NUMBER
24500
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
953780420
APN
25024001
CURRENT_STATUS
02
SITE_LOCATION
24500 S MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Investigate and evaluate possible interim remediation alternatives, if necessary <br /> • Prepare a report utilizing a California Registered Geologist in accordance with California <br /> ' State guidelines that presents all analytical data and interpretations, and recommendations for <br /> further work as appropriate <br /> 4.0 PROJECT MANAGEMENT AND RESPONSIBILITIES <br /> 4.1 Project Manager <br /> Dr Ross R Grunwald will be assigned as project manager who will be responsible for the <br /> overall performance and compliance with applicable regulations, and the Health and Safety <br /> ' Plan guidelines <br /> ' 4.2 Site Health and Safety Officer <br /> Dr Ross R Grunwald will be assigned as Health and Safety Officer who will be <br /> ' responsible for the on-site Health and Safety procedural guidelines compliance This <br /> individual has the authority to stop on-site work due to safety infractions, and can upgrade <br /> the safety requirements based on his/her judgment The Health and Safety Officer will fill <br /> out and maintain all records, checklists, and logs, and will keep a copy of this plan at the <br /> site Due to the small size of this projects the Project Manager will serve as the Health <br /> and Safety Officer <br />� 1 <br /> ' 5.0 SITE HAZARD ANALYSIS <br /> 5.1 Primary Health Hazards <br /> The proposed scope of work described in the Work Plan and all available analytical <br /> ' information regarding hazardous substances previously identified at the site will be used to <br /> outline the anticipated health hazards The known hazardous materials at this site consist <br /> of gasoline and associated compounds which leaked into the soil and ground water <br /> ' The primary health hazards associated with exposure are provide below in this project <br /> plan The associated permissible exposure limits (PEL), if available, will also be included <br /> ' The PEL will be defined by state and federal regulations The PELs are based on research <br /> guidelines from the National Institute for Occupational Safety and Health (NIOSH) and <br /> the American Conference of Governmental Industrial Hygienists (ACGIH) <br /> CA95DE-029 <br /> American Geological Services, Inc <br /> ' 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.