Laserfiche WebLink
f <br /> LEARWATER <br /> C K o L P i \ c <br /> 1.0 INTRODUCTION <br /> This report presents the results of groundwater monitoring conducted by <br /> Clearwater Group, Inc (Clearwater) on behalf of Mel Bokides Petroleum <br /> (MBP) at the property located at 501 West Lodi Avenue in Lodi, California <br /> (Figure 1) On March 14, 1996, Clearwater gauged and sampled two <br /> monitoring wells Iocated on the subject property <br /> 2.0 SITE DESCRIPTION <br /> The MBP property is a service station located on the northwestern corner of <br /> the intersection of West Lodz Avenue and South Hutchins Street The <br /> surrounding neighborhood consists of both residential and commercial <br /> buildings The FDIC site, located just south of the MBP property, is currently <br /> occupied by a Togo's Sandwich Shop It was formerly a Texaco service station <br /> MBP purchased the subject location approximately eleven years ago, in early <br /> . 1985, for the purpose of operating a service station Prior to 1985, the site had <br /> been operated as a service station by various parties Between December 1949 <br /> and June 1966 the site was leased by Tide Water Associated Oil Company <br /> (Tide Water) Tide Water's lease interest was assigned to Phillips Petroleum <br /> Company in 1966 The site ownership and leasing history between 1966 and <br /> 1985 is not well established, although Autotronics Systems, Inc is believed to <br /> have had operations at the site during the early 1970s <br /> Three grades of unleaded gasoline are currently dispensed at the MBP <br /> property The fuel is stored in three 10,000-gallon underground storage tanks <br /> (USTs) located in the north central part of the property (Figure 2) <br /> In July, 1995 Clearwater installed two 4-inch-diameter monitoring wells <br /> (BMW-1 and BMW-2) to a depth of 68 feet below ground surface (bgs) The <br /> wells were installed to evaluate soil and groundwater conditions in the <br /> vicinity of existing USTs and fuel dispensers (Figure 2) Results of the <br /> investigation are presented in Clearwater's Preliminary Site Assessment <br /> Report, dated October 11, 1995 <br /> C-115 1Q/96 1 Apnl 12, 1996 <br />