My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012452
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
501
>
2900 - Site Mitigation Program
>
PR0505714
>
ARCHIVED REPORTS_XR0012452
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2020 12:37:28 PM
Creation date
3/4/2020 9:34:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012452
RECORD_ID
PR0505714
PE
2950
FACILITY_ID
FA0003590
FACILITY_NAME
M B P
STREET_NUMBER
501
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
03731045
CURRENT_STATUS
02
SITE_LOCATION
501 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Quarterly Report - Third and Fourth Quarters 2002 <br /> MEL BOKIDES PETROLEUM, INC. <br /> ' 501 W. Lodi Avenue, Lodi, California <br /> ' 1.0. INTRODUCTION <br /> At the request of Mr. Nicholas Bokides of Mel Bokides Petroleum, Inc., Advanced <br /> GeoEnvironmental, Inc. (AGE) has prepared this quarterly report for 501 W. Lodi Avenue, Lodi, <br /> California (site). Two soil probe borings were advanced on 25 October 2002, seven soil-vapor <br /> ' sampling events were conducted between July and December 2002 and the fourth quarter ground <br /> water monitoring event was conducted on 11 December 2002. The site setting is illustrated on <br /> Figure 1. Site structures and monitoring well locations are depicted on Figure 2. <br /> A summary of previous investigations at the site was included in the AGE-prepared Work Plan for <br /> Site Assessment, Mel Bokides Petroleum, 501 West Lodi Avenue, Lodi, California, dated 15 May <br /> ' 1998. Soil boring installation and sampling procedures for the site were outlined in Remedial Action <br /> Work Plan, dated 27 March 2000 and approved by the EHD by letter dated 20 April 2002. <br /> ' 2.0. PROCEDURES <br /> Field work was conducted in accordance with guidelines issued by the Central Valley Regional <br /> ' Water Quality Control Board (CVRWQCB) and directives issued by the San Joaquin County <br /> Environmental Health Department (EHD) for subsurface investigations and sampling of ground <br /> ' water monitoring wells at sites with underground storage tank (UST) system releases. <br /> 2.1. ADVANCEMENT OF SOILTROBE BORINGS <br /> On 25 October 2002, two soil probe borings (CB 1 and C132) were advanced at the site to collect <br /> ' confirmation soil samples in order to assess the progress of soil-vapor extraction. The borings were <br /> advanced to a total depth of 35 feet below surface grade (bsg) utilizing a van-mounted Geoprobe <br /> ' 5400 direct-push probing unit equipped with 1.25-inch diameter probing rods; the probing unit <br /> advances soil probe borings using a hydraulic hammer to drive soil and ground water sampling tools <br /> to specified depths.One boring(CB 1)was advanced in the former UST excavation near well BMW- <br /> , 4 and the other boring (CB2) was advanced at vapor well VW-1, at the former dispenser area <br /> (Figure 2). <br /> 2.1.1. Confirmation Soil Sample Collection <br /> ' Discrete confirmation soil samples were collected at 5-foot intervals,beginning at 10 feet bsg,using <br /> the Geoprobe push-driven 2-inch diameter soil sampler fitted with four six-inch long brass sleeves. <br /> Soil samples were collected to a depth of 35 feet bsg in boring CB2, and to a depth of 35 feet bsg <br /> ' in boring CBI before boring was terminated due to poor drilling conditions. <br /> Advanced GeoEnvironmental,Inc. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.