My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
601
>
2900 - Site Mitigation Program
>
PR0523150
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2020 11:39:28 AM
Creation date
3/4/2020 11:03:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0523150
PE
2950
FACILITY_ID
FA0015629
FACILITY_NAME
EXPRESS SMOG II (FORMERLY ARCO)
STREET_NUMBER
601
Direction
W
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
03712055
CURRENT_STATUS
01
SITE_LOCATION
601 W LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Ground Zero Analysis, Inc. <br /> SITE SAFETY PLAN <br /> Job Name: Howen/Lodi <br /> Job Location: 601 W. Lockeford Street, Lodi, CA <br /> Client Name: Larry Howen <br /> Project Number: 04-631 <br /> General Work Description:.Drill and sample six (6) soil borings. <br /> SSP Prepared by: Joe Vasquez <br /> On-site Safety Officer: Joe Vasquez <br /> Project Safety Officer: John Lane <br /> This site safety and health plan (SSP) must be kept on-site and accessible to all on-site employees <br /> during all phases of site operations. The SSP must be reviewed and signed by all on-site <br /> employees, subcontractors, and visitors prior to entering the site. <br /> The provisions set-forth in this SSP shall apply to GZA ;employees and any subcontractors <br /> working for GZA at the job site. All personnel working for GZA at the job site must read this <br /> SSP, and sign the attached Compliance Agreement before entering the work area. Field <br /> personnel may deviate from the safety provisions set-forth in this SSP, but only to upgrade or <br /> increase the safety requirements. GZA personnel may suspend work if unsafe working <br /> conditions are identified or observed, or unauthorized modifications to the safety provisions set- <br /> forth in this SSP are made. If changes in site or working conditions require changes in safety <br /> procedures, appropriate amendments to this SSP will be provided by the GZA project manager or <br /> supervisor, with the written approval of the GZA Health and Safety Director. <br /> f <br /> PAGE 1 <br /> i <br /> a <br />
The URL can be used to link to this page
Your browser does not support the video tag.