My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
601
>
2900 - Site Mitigation Program
>
PR0523150
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2020 11:39:28 AM
Creation date
3/4/2020 11:03:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0523150
PE
2950
FACILITY_ID
FA0015629
FACILITY_NAME
EXPRESS SMOG II (FORMERLY ARCO)
STREET_NUMBER
601
Direction
W
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
03712055
CURRENT_STATUS
01
SITE_LOCATION
601 W LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Ground Zero Analysis, Inc. <br /> SITE SAFETY PLAN <br /> PERSONAL PROTECTIVE EQUIPMENT <br /> As a minimum Level D protection is required on all GZA work sites. Level D includes: <br /> ✓ Steel toed boots <br /> ✓ Safety Glasses <br /> ✓ Hard Hat <br /> For each task on this project, identify additional protective garments as required. Include the <br /> conditions under which the level of PPE would be modified for each task. <br /> Task(s) T7 Condition Personnel Garment(s) <br /> f <br /> None Working Near Vehicle Orange Safety Vests or <br /> other Hi Vis garments <br /> 1,2 >20m for 5' it minutes .112 Face Respirator w <br /> pp pato /OV <br /> cartridges <br /> 1,2 >200 ppm for 5 minutes Evacuate Site Full Face Respirator wIOV <br /> cartridges <br /> x, <br /> i <br /> SITE CONTROL AND COMMUNICATIONS <br /> The buddy system must be used on all GZA hazardous waste sites. <br /> Site will be secured as follows: Fencing will be used when possible. <br /> Work Zones will be marked as follows: Barricades and caution tape will be used to mark off <br /> work zone. <br /> MARK WORK ZONES ON SITE MAP ❑CHECK WHEN DONE. <br /> PAGE 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.