Laserfiche WebLink
Ground Zero Analysis, Inc. <br /> SITE SAFETY PLAN <br /> On-site communications: ❑ Radio IZI Verbal ❑ Hand Signals <br /> ❑ Other <br /> ;Designate hand signals here: <br /> Off-site communications: ❑ Radio 1E Telephone <br /> ❑ Other <br /> The specific signal for an emergency is: Verbally Given <br /> The specific signal for an evacuation is: Verbally Given <br /> Evacuation assembly point is: North side of the adjacent office building <br /> MARK EVACUATION ROUTE(S) ON SITE MAP ❑CHECK.WHEN DONE <br /> SANITATION AND DECONTAMINATION <br /> 1 Personnel Decontamination Procedure: <br /> All contaminated personal protective equipment (i.e., gloves, coveralls) will be placed in drums and <br /> i with the drill cuttings: <br /> a' Location of Wash Water.- At site. <br /> f <br /> t <br /> Location of Toilet_ At site. <br /> Location of Drinking Water: At site. <br /> I - <br /> MARK LOCATION OF EYEWASH AND SHOWER DRENCH ON SITE MAP ©CHECK WHEN DONE <br /> i <br /> Equipment Decontamination Procedure: Equipment will be washed with a trisodium phosphate <br />! solution and/or steamcleaned. <br /> Materials to be Disposed of as Hazardous Waste: All drill cuttings and water produced will be <br /> stored on-site until appropriate disposal <br /> methods are determined. <br /> 1 <br /> k <br /> r PAGE 8 <br /> a <br />