My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOWER SACRAMENTO
>
18970
>
2900 - Site Mitigation Program
>
PR0516743
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2020 12:42:06 PM
Creation date
3/4/2020 11:30:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0516743
PE
2950
FACILITY_ID
FA0012768
FACILITY_NAME
WOODBRIDGE ARCO-STORE #5650
STREET_NUMBER
18970
STREET_NAME
LOWER SACRAMENTO
STREET_TYPE
RD
City
WOODBRIDGE
Zip
95258
CURRENT_STATUS
01
SITE_LOCATION
18970 LOWER SACRAMENTO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Additional Subsurface Investigation Report <br /> '.� Woodbridge Arco - Store No. 5650 <br /> 18970 Lower Sacramento Road, Lodi,California <br /> ..r <br /> 1.0. INTRODUCTION <br /> At the request of Mr. Lawrence Wight of Wight Enterprises, Advanced GeoEnvironmental, Inc. <br /> (AGE) has prepared Additional Subsurface Investigation Report for the property at 18970 Lower <br /> Sacramento Road,Lodi,California(the site).The location of the site is illustrated on Figure 1.Major <br /> features on the site and ground water monitoring well locations are illustrated on Figure 2.The work <br /> was performed to assess for possible petroleum hydrocarbon-impact to ground water related to the <br /> on-site underground storage tank(USTs) facility. <br /> Background information was summarized in the AGE-prepared, Preliminary Subsurface <br /> Investigation Work Plan dated 12 February 2001 and in Preliminary Subsrface Investigation Work <br /> Plan dated 30 March 2001:Ground water monitoring well MW-2 was misidentified as MW-1 in the <br /> latter report. <br /> 2.0. PROCEDURES <br /> On 19 June 2001 two on-site ground water monitoring wells (MW-1 and MW-3)were purged and <br /> sampled by a representative of AGE. <br /> 2.1. MONITORING WELL PURGE PROCEDURES <br /> Onl9 March 2001, a two-stage submersible pump was used to purge monitoring well MW-1 and <br /> MW-3 of standing water. Approximately 30 to 31 gallons of water were removed from the wells <br /> (approximately 3 casing-water volumes).Ground water stabilization data is included in Appendix A. <br /> 2.2. COLLECTION AND LABORATORY ANALYSIS OF GROUND WATER SAMPLES <br /> Following purging and allowing a minimum of 80%recovery of initial water volume in the wells, <br /> water samples were collected from the purged wells using a new disposable plastic bailer.The water <br /> samples were transferred into laboratory-supplied 40-m1 VOA vials containing 0.5 ml 18% <br /> hydrochloric acid as a sample preservative. After collection, the samples were properly labeled, <br /> placed in a chilled container and transported under chain-of-custody to McCampbell Analytical Inc. <br /> (MAI) and were analyzed for: <br /> • Total petroleum hydrocarbons quantified as gasoline (TPH-g) in accordance with EPA <br /> Method 8015m. <br /> Advanced GeoEnviron mental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.