Laserfiche WebLink
FILE COPY <br /> .......... <br /> t EN�/IRONMENiAL INC Y <br /> y 3330 Cameron Park Drive, Ste 550 <br /> Cameron Park, California 95682 j <br /> i (530)676-6004-Fax:(530)676-6005 <br /> I ' <br /> May 14,2008 <br /> i <br /> Project No. 2060=1426-01 <br /> Mr. James Barton <br /> Engineering Geologist <br /> California Regional Waterualit <br /> Q Y . <br /> Control Board—Central Valley Region <br /> 11020 Sun Center Drive <br /> Rancho Cordova, California 95670-6114 i <br /> I <br /> Subj ect: Work Plan for Additional Site Assessment <br /> Former Dolly Madison Bakery Facility <br /> 1426 South Lincoln Street <br /> Stockton, California <br /> Cleanup and Abatement Order No. R5-2006-0725 <br /> Dear Mr. Barton: <br /> I <br /> Stratus Environmental; Inc, <br /> (Stratus) has prepared this World plan for Additional Site <br /> Assessment (Work Plan), on behalf of Mr. Timothy Kong.(co-Responsible Party), for the <br /> former Dolly Madison Bakery facility (the Site), located at 1426 South Lincoln Street, <br /> Stockton,. California (see Figure 1 and Figure 2). As directed. by a Cleanup and <br /> Abatement Order (CAO) for the subject property, a subsurface investigation was <br /> h 2008, in order to. further characterize the <br /> completed between December 2007 and Marc <br /> extent of petroleum hydrocarbon impact to the subsurface in the site vicinity. After 'r <br /> reviewing the results of the.investigation, additional characterization of the extent of this <br /> petroleum hydrocarbon impact appears warranted. As stipulated. in the CAO directive, <br /> Stratus is therefore proposing a scope of work to further assess the distribution of I <br /> petroleum hydrocarbons to the --subsurface in the site vicinity. The installation of five <br /> additional groundwater monitoring wells at the subject property appears appropriate to <br /> further evaluate impact to the subsurface in the site,vicinity, and is proposed in this <br /> document. This document also proposes the installation of additional vapor extraction 1 <br /> and air sparge wells for use in remediation of the vadose zone and shallow water bearing <br /> strata at the site. -Details associated with completing the proposed monitoring and <br /> remediation well installations are discussed in the following subsections of this Work <br /> Plan. <br /> KATimodiv Kona Property\Work Plans\Kong-mav08worknlan.doc <br />