Laserfiche WebLink
m <br /> Mr.James Barton,RWQCB May 14, 2008 <br /> Work Plan for Additional Site Assessment <br /> Former Dolly Madison Bakery,Stockton,California <br /> Page 8 <br /> impact, Stratus is proposing to complete three additional groundwater monitoring wells <br /> (MW-17 through MW-19) to-' this interval of the subsurface. Since MW-17 through <br /> MW-19 will be situated outside of the known area of petroleum hydrocarbon impact to <br /> shallow groundwater, installation using the hollow stem auger drilling method (instead of <br /> the sonic method used to complete MW-8,MW-9, and MW-14) is proposed. <br /> In March 2008, Stratus completed'a pilot test to evaluate use of soil vapor extraction(SVE) <br /> and air sparging (AS) to mitigate petroleum hydrocarbon impact to vadose zone soil and <br /> shallow groundwater. The results of the pilot test indicate that SVE and AS appear to be <br /> viable remedial alternatives for remediating shallow-petroleum hydrocarbon impact to the <br /> subject property: A report documenting this pilot test will be submitted in May 2008. The <br /> report will recommend that an SVE/AS remedial system be installed at the site. Stratus is <br /> proposing to install three additional vapor extraction wells (VW-4 through VW-6) and three <br /> additional air sparge wells (AS-2 through AS-4) during this phase of investigation at the <br /> site. Installation of the vapor extraction and air sparge wells at this time will eliminate the <br /> need for separate mobilizations of drilling equipment to the,site prior to initiating remedial <br /> efforts, and may reduce the time needed to begin mitigation of impact to the shallow <br /> -subsurface. <br /> SCOPE OF WORK <br /> i <br /> The objectives of the proposed scope of work are to: <br /> • Further assess the lateral and vertical extent of petroleum hydrocarbon impact to the <br /> subsurface. <br /> • Furthercharacterize the geology beneath the site. <br /> • Install additional remediation wells during this phase of investigation.for future use <br /> in SVE/AS remediation. <br /> • If required by the City of Stockton,properly destroy well MW-3. <br /> To accomplish these objectives, Stratus is proposing the following work activities: <br /> •. Drill and install two (2) groundwater monitoring wells (MW-15 and MW-16) to <br /> approximately 35 feet bgs using the hollow stem auger drilling method. <br /> • Drill and install three (3) vapor extraction wells (VW-4 through VW-6) to <br /> approximately 25 feet bgs using the hollow stem auger drilling method. <br /> • Drill and install three (3) air sparge wells (AS-2 through AS-4)to approximately 32 <br /> feet bgs using the hollow stem auger drilling method. <br /> KATimotby Kong Propert-y\Work Plans\Kong_rnayn$worimlan.doc <br />