Laserfiche WebLink
4 <br /> i <br /> Site Assessment Work Plan Advanced Environmental Concepts,'Inc. <br /> Health & Safety Plan <br /> fpr <br /> Robertetti & Sons Property <br /> perty <br /> 700 West Linne Road <br /> County of San Joaquin . Tracy, California <br /> i <br /> Introduction: <br /> t <br /> A Site Safety Plan(SSP)has been designed to address safety provisions needed during the site soil 3 <br /> assessment/remediation. It's purpose is to provide established procedures'to protect all on-site <br /> C personnel from direct skin contact, inhalation,or ingestion of potentially hazardous materials that <br /> may be encountered at the site. The SSP establishes personnel responslbilities, personal <br /> protective equipment standards, decontamination procedures and emergency action plans. <br /> C <br /> Advanced Environmental Concepts, Inc. seeks to enter the property described above for the <br /> purpose of conducting a site assessment- consisting of soil boring, sampling, and possible <br /> groundwater monitoring well installation, to assess petroleum hydrocarbon impacted soil and/or <br /> groundwater. <br /> F <br /> { Drilling equipment will be brought to the site and operated by: <br /> L SB&S Environmental Drilling <br /> 7756 Floradora <br /> Fresno, California 93727 <br /> (209) 252-9460 <br /> C57 560175 <br /> This SSP describes means for protecting all on-site personnel from deleterious contamination of I <br /> personal injury while conducting on-site activities. As described below, we-,will strive to meet all i <br /> requirements promulgated by the California Department of Health Services. <br /> Res nsibilitles of Ke Personnel: <br /> tooy <br /> All personnel on-site will have assigned responsibilities. Mr. Jonathan Buck will serve as Project <br /> Manager and on-site Engineer. He will also'serve as Site Safety Officer (SSO). As SSO, Mr. Buck <br /> will assure that on-site personnel have received a copy of the SSP. Personnel will be required to <br /> document their full understanding of the SSP before admission to the site. Compliance with the <br /> SSP will be monitored at all times by the SSO Appropriate personal protective equipment, listed <br /> below,will be available and utilized by all on-site personnel. Prior to beginning work, the SSO will <br /> conduct a training session to assure that all are aware of safe work practices. In the training <br /> session, personnel will be made aware of hazards at the site and will utilize 1Material Safety Data i <br /> Sheets for information on compounds to be encountered. <br /> F <br /> Project: AEC 96G1707 1 <br /> w <br /> ;3 <br /> � f <br />