My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
700
>
2900 - Site Mitigation Program
>
PR0506469
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2020 2:24:51 PM
Creation date
3/4/2020 2:21:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506469
PE
2951
FACILITY_ID
FA0007643
FACILITY_NAME
DURHAM RANCH
STREET_NUMBER
700
Direction
W
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25527038
CURRENT_STATUS
02
SITE_LOCATION
700 W LINNE RD
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br /> t <br /> Site Assessment Work Plan Advanced Environmental Concepts, Inc. <br /> Mr. Buck will also be responsible for keeping field notes, collecting and securing samples, and <br /> assuring sample integrity by adherence to Chain-of-Custody protocol. j <br /> All on-site employees will take reasonable) precautions to avoid unforeseen hazards; After <br /> documenting their understanding of the SSP,',each on-site employee will be'responsible for strict <br /> adherence to all points contained herein. Any deviation observed will bereported to the SSO <br /> and corrected. On-site employees are held responsible to perform only those tasks for which they i <br /> believe they are qualified. Provisions of this ISSP are mandatory and personnel associated with <br /> on-site activities will adhere strictly hereto. <br /> r � <br /> Lr Job Hazard Analyses: <br /> Hazards likely to be encountered on-site include those commonly encountered when operating <br /> any mechanical equipment, such as the danger of falling objects or moving machinery. Simple <br /> precautions will reduce or eliminate risks associated with operating such equipment. <br /> Global Probe Inc. will deliver and operate all boring equipment. Qualified personnel only will <br /> have any contact with this equipment. All on=site personnel, including the drilling contractor and <br /> his employees, are required to wear hard hats when in close proximity to equipment. Latex <br /> sampling gloves will be worn by persons collecting or handling samples to prevent exposure to <br /> contaminants. Gloves will be changed between samples and used ones;discarded, to avoid <br /> cross-contamination. Proper respiratoryequipment will be worn if vapor contamination levels on- <br /> site exceed action levels as determined using a Photoionization Detector, (PID). Action levels <br /> requiring respiratory apparatus will be 5-ppm, in the breathing space. Furthermore, no on-site <br /> smoking, open flame or sparks will be permitted in order to prevent accidental ignition. <br /> Risk Assessment Summary: <br /> w <br /> F <br /> Exposure to chemicals anticipated on-site include gasoline, diesel, and benzene, toluene, <br /> ethylbenzene, and xylene (BTEX). These chemicals represent a hazard because they are <br /> moderately to extremely toxic and most are:highly flammable. i <br /> Threshold Limit Values (TLV's),Short Term Exposure Limits (STEL's)and Toxicity levels (LD50, oral-rat), <br /> all in mg/kg (ppm), are listed below: , <br /> r Compound TLV STEL T8xicity <br /> Gasoline 200 300 - <br /> Diesel 50 75 --- <br /> Benzene 10 25 4894 l <br /> Toluene 100 150 5000 j <br /> Xylene 100 150 4300 <br /> Benzene is considered an extreme cancer hazard, Applicable MSDS forms are attached. M <br /> Project: AEC 96C-1707 2 <br /> E <br /> i� <br />
The URL can be used to link to this page
Your browser does not support the video tag.