My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
700
>
2900 - Site Mitigation Program
>
PR0506469
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2020 2:24:51 PM
Creation date
3/4/2020 2:21:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506469
PE
2951
FACILITY_ID
FA0007643
FACILITY_NAME
DURHAM RANCH
STREET_NUMBER
700
Direction
W
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25527038
CURRENT_STATUS
02
SITE_LOCATION
700 W LINNE RD
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Assessment Work Plan Advanced Environmental Concepts, Inc. <br /> V <br /> Exposure Monitoring Plan: <br /> Air monitoring will be conducted during excavation procedures using a TIPrmll Photoionization <br /> Detector (PID) equipped with a 10.6eV lamp, manufactured by Photovac, Inc. The PID will be <br /> calibrated to 50 ppm hexane. These air monitoring procedures will be carried out in accordance <br /> with San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) guidelines. Volatile <br /> emissions are not anticipated but will nevertheless be monitored. <br /> Imp Personal Protective Eauloment: <br /> When handling samples, the on-site Geologist will wear latex gloves. Hard hats will be worn by <br /> all personnel on-site when in proximity of excavation equipment. <br /> Work Zones and Security Measures: <br /> V <br /> Access to the site will be restricted to authorized personnel. A set of cones, placards or wide <br /> yellow tape, surrounding the site,will define the perimeter, if needed. The Project Manager will <br /> ,r be responsible for site security. <br /> Decontamination Measures: <br /> Avoidance of contamination whenever possible is the best method for protection. Common sense <br /> dictates that on-site personnel avoid sitting, leaning or placing equipment on possible <br /> contaminated soil. All personnel will be advised to wash their hands, neck and face with soap <br /> �• and water before taking a break or leaving the site. <br /> General Safe Work Practices: <br /> On-site personnel will be briefed each day in "tailgate" meetings as to the day's goals and <br /> equipment to be used. Anticipated contaminants and emergency procedures will be reviewed. <br /> Appropriate personal protective equipment will be put on and verified correct by SSO, including <br /> `r respirator fit. <br /> Excavation and sampling equipment will be steam-cleaned before being brought on-site. The <br /> on-site Geologist will oversee operations and log the excavation strata. The Sample Coordinator <br /> will assure that proper protocol is used at all times in collecting and handling samples. <br /> Training Reauirements: <br /> The SSO will conduct a pre-site training session which will include all points of MSDS forms, <br /> contaminant properties, warning signs, health hazard data, risk from exposure and emergency <br /> first aid. <br /> All chemicals are to be covered and the SSO will assure that everyone fully understands site <br /> hazards. <br /> Project: AEC 96C-9707 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.