My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
401
>
3500 - Local Oversight Program
>
PR0545380
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2020 3:54:02 PM
Creation date
3/4/2020 3:42:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545380
PE
3528
FACILITY_ID
FA0012145
FACILITY_NAME
INDEPENDENT TRUCKING
STREET_NUMBER
401
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95203
CURRENT_STATUS
02
SITE_LOCATION
401 S LINCOLN ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K::3L <br /> 4.2 .3 Site Safety Officer <br /> The ICES Site Safety Officer (SSO) , Derek Wong, has fulfilled <br /> the 40-hour health and safety training requirements pursuant <br /> to 29 CFR 1910 . 120 . <br /> The SSO, or a trained designated alternate, will be present at <br /> the Site during work activities . The SSO shall be notified of <br /> and approve activities in which persons may be reasonably <br /> expected to be exposed to contaminated soils and/or <br /> groundwater. <br /> The SSO shall be responsible for: <br /> • ensuring that on-site ICES personnel comply with the <br /> requirements of the HSP <br /> • limiting access to the Site <br /> • reporting unusual or potentially hazardous conditions to <br /> the ICES Health and Safety Director and the ICES Project <br /> Manager <br /> I <br /> • reporting injuries, exposures, or illnesses to the ICES <br /> Health and Safety Director and the ICES Project Manager <br /> • communicating proposed changes in work scope or <br /> procedures to the ICES Health and Safety Director for <br /> approval <br /> • recommending to the ICES Health and Safety Director and <br /> the ICES Project Manager additional safety procedures or <br /> precautions that might be implemented. <br /> The SSO shall have the authority to : <br /> I <br /> • order an evacuation of the Site, or portion (s) of the <br /> Site, or shut down any operation if he believes a health <br /> or safety hazard exists <br /> • deny site access to unauthorized personnel <br /> • require that any worker, including the contractor ' s or <br /> subcontractor' s personnel, obtain immediate medical <br /> attention. <br /> E . <br /> 6 <br /> IY <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.