Laserfiche WebLink
KA <br /> anticipated at the Site and p ocedures and precautions to <br /> N , be implemented on the job <br /> -, ensuring that contractors and subcontractors are informed <br /> of the expected hazards and appropriate protective <br /> measures at the Site. (Subcontractors should also be <br /> given a copy of ICES ' s ,HSP for review. ) <br /> ensuring that resources are available to provide a safe <br /> and healthy work environment or ICES personnel . <br /> 4.2 .2 ICES Health and Safety Director <br /> The ICES Health and Safety Director, Peng Leong, shall be <br /> responsible for : <br /> • monitoring the health and safety impacts of this project <br /> for on-site ICES personnel <br /> • assessing the potential health and safety hazards at the <br /> Site <br /> • recommending appropriate safeguards and procedures <br /> • modifying the HSP, when necessary <br /> • approving changes in safeguards used or operating <br /> procedures employed at the Si e . <br /> The ICES Health and Safety Director shall have the authority <br /> to : <br /> require that additional safety precautions or procedures <br /> be implemented <br /> order an evacuation of the Site, or portion of the Site, <br /> or shut down any operation, if he believes a health or <br /> safety hazard exists <br /> • deny unauthorized personnel access to the Site <br /> • require that any worker obtain immediate medical <br /> attention <br /> • approve or disallow any proposed modifications to safety <br /> precautions or working procedures . <br /> 5 <br />