Laserfiche WebLink
i. <br /> Claim 8500 -2- November 8, 2004 <br /> • If a different scope of work becomes necessary, then you must request pre-approval of costs I' <br /> on the new scope of work. - <br /> ,i <br /> • Although I have referred to the Geological Technics, Inc. proposal in my pre-approval above, r <br /> please be aware that you will be entering into a private contract: the State of California cannot <br /> compel you to sign any specific contract. <br /> Please remember that it is still necessary to sul5mit the actual costs of the work as explained in the <br /> Reimbursement Request Instructions to confirm that the costs are consistent with this pre- <br /> approval before you will be reimbursed. Please insure that your consultant prepares their <br /> invoices to include the required breakdown of costs on.a time and materials basis, that invoiced <br /> tasks..are consistent.with.theorig#aal proposal,-and that reasonable explanations are provided <br /> for any changes made in the scope of work or'increases in the costs. When the invoices are <br /> submitted you must include copies of all: I <br /> • subcontractor invoices, <br /> • technical reports, when available, and E <br /> • applicable correspondence from the County. <br /> Please feel free to contact Bob Trommer (Technical Unit_Chief) at (916) 341-5684, or myself at <br /> (916) 341-5796 if you have any questions. <br /> Sincerely, <br /> Mark Owens, PE, Water Resources Control Engineer --, <br /> Technical Review Unit <br /> Undergroun&Storage Tank Cleanup Fund <br /> cc: Lori Duncan Raynold Kablanow <br /> San Joaquin Environmental Health Department Geological Technics Inc. <br /> J <br /> California Environmental Protection Agency <br /> Ot Reeycled Paper <br /> i <br />