My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
3780
>
3500 - Local Oversight Program
>
PR0545387
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2020 4:57:19 PM
Creation date
3/4/2020 4:51:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545387
PE
3528
FACILITY_ID
FA0005718
FACILITY_NAME
SINCLAIR TRUCKING
STREET_NUMBER
3780
Direction
W
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
3780 W LINNE RD
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> SAN JOAQUIN COUNTY <br /> Unit Supervisors <br /> Donna K.Heran,R.E.H.S. 304 East Weber Avenue, Third Floor Carl Bergman,R.E.H.S. <br /> f Director <br /> Mike Huggins,R.E.H.S.,R.D.I. <br /> Al Olsen,R.E.H.S. Stockton, California 95202-2708 Douglas W.Wilson,R.E.H.S. <br /> •.c �� :• ram <br /> Pro Manager <br /> g Telephone: (209) 46$-3420 Margaret Lagorio,R.E.H.S. <br /> Laurie A.Cotulla.R.E.H.S. Robert McClellon,RIM.S. <br /> Program Manager Fax: (209) 464-0138 Mark Barcellos,R.E.H.S. <br /> DONALD SINCLAIR MAY I J 2004 <br /> SHIRLEY THOMPSON <br /> 3780 LINNE ROAD <br /> TRACY CA 95376 <br /> RE: Sinclair Trucking SITE CODE: 1916 <br /> 3780 Linne Road <br /> Tracy CA 95376 <br /> San Joaquin County Environmental Health Department (SJCIEHD) has reviewed <br /> "Report-initial Site Conceptual Model"dated June 18, 2003 and "Feasibility Study <br /> Addendum (Cost Comparisons)"(Addendum) dated April 26, 2004 that were prepared <br /> on your behalf by Geological Technics Inc. (GTI) and has the following comments. <br /> In general, the Site Conceptual Model (SCM) reasonably addresses the primary issues <br /> for the site; the vertical extent of impacted groundwater is delineated, the lateral extent <br /> of impacted media has been delineated, and the sorbed and dissolved contaminant <br /> masses have been estimated. However, SJCIEHD found a difficulty with the fact that <br /> the borings lags submitted with the SCM, on which the cross sectional diagram and the <br /> findings were'based, have all been altered from the original boring logs submitted to this <br /> agency, with the exception of the log for monitoring well MW-101. No explanation for the <br /> alteration of the original boring logs was provided. SJCIEHD is aware that GTI <br /> maintains a library of soil samples from the borings they advance. If a new boring log <br /> has been produced based on re-examination of the samples, the new boring log should <br /> contain the relevant data to make this apparent to subsequent users of the logs and to <br /> minimize confusion. At a minimum, the new log should include the name of the <br /> investigator re-describing the soils, the date, and a notation that the log has been <br /> revised. In this case, it appears there may be errors in the new logs. Looking at MW 1, <br /> for instance, some blow counts have changed; some sandy silt and clayey silt symbols <br /> have changed from the correct ML designation to the incorrect SM and CL designations, <br /> respectively. Also, lithology logged as silt on the logs are shown as clay on the cross <br /> section. As it stands, SJCIEHD cannot concur with this model as presented. Please <br /> submit corrected boring logs and cross sections. <br /> In correspondence dated July 18, 2003, SJCIEHD directed you to have your consultant <br /> submit cost comparisons for the remedial alternatives they had discussed in "Feasibility <br /> Study/Corrective Action Plan" (CAP) dated June 25, 2003. In the CAP, GTI proposed <br /> excavation and removal of contaminated soil as the final remediation plan for your site. <br /> However, without cost comparisons SJC/EHD could not complete review of the <br /> document. <br />
The URL can be used to link to this page
Your browser does not support the video tag.