Laserfiche WebLink
Geological nechnia Inc, <br /> Sinclair Trucking Page 4 <br /> Project No.: 1030.2 <br /> August 8,2003 <br /> Tentative Schedule for Implementing Work <br /> The proposed schedule for the additional site characterization work and risk evaluation study is <br /> as follows: <br /> Task Description Completion Date <br /> • Submit Bids/Cost pre-approval to the Fund August 2003 <br /> • Receive Cost approval from the Fund Early September 2003 <br /> • Install Monitoring Well Late September 2003 <br /> • Install GeoProbe Borings Late September 2003 <br /> • Submit Interim Site Characterization Report October 2003 <br /> • Perform Groundwater Monitoring October 2003 —October 2004 <br /> • Submit Remedial Design Plan November 2003 <br /> Thank you for your attention to this project. Call GTI at (209) 522-4119 or fax us at (209) 522- <br /> 4227 if you have questions or need clarification. <br /> i <br /> Respectfully Submitte <br /> Raynold 1. Kablanow II, Ph.D. <br /> cc: Mr. and Mrs. Sinclair <br /> Lori Duncan— SJC-EHD <br /> l <br />