Laserfiche WebLink
page 2, 3780 W. Linne Road <br /> attenuation (MNA), requires long term groundwater monitoring and sampling to ensure <br /> the plume attenuates faster than it migrates. However, a feasibility study and/or tests <br /> must be conducted in order to determine the most cost effective remediation method. <br /> Please submit a site conceptual model, a:feasibility study and a work plan to complete <br /> the site investigation to SJC/EHD by April25, 2003. Routine quarterly groundwater <br /> monitoring and sampling must continue at this site until directed otherwise by this <br /> agency. <br /> If you have any questions or comments please call Lori Duncan at (209)468-0337. <br /> Donna Heran, REHS, Director <br /> Environmental Health Department <br /> Lori Duncan, Senior REHS Nuel C. Henderson, Jr., RG v <br /> LOP/Site Mitigation Unit IV LOP/Site Mitigation Unit IV <br /> cc: James L.L. Barton, CVRWQCB <br /> Eric Price, GTI <br /> k <br /> i <br />