Laserfiche WebLink
Geological recwcs/ac. %W1 SM001 Page 2 <br /> Del Tech(Sinclair&Thompson Property) <br /> Project No. 320.2 <br /> September 21,2001 <br /> new work plan on June 9, 2000 proposing the installation of a single deep monitoring well. Ms. <br /> Duncan approved the work plan on June 28, 2000. <br /> Summa of Proposed Corrective Action Work <br /> The work to be performed is outlined below: <br /> 1. Prepare a monitoring well installation and groundwater monitoring work plan. This has <br /> already been completed and approved. <br /> 2. Install one 2-inch diameter by approximately 50-foot deep monitoring well. Since this well <br /> will be drilled through the contaminated source area it will be installed with a conductor <br /> casing to limit the possibility of dragging contamination down into the deeper aquifer. <br /> Installing a conductor casing causes the fob to take two days to perform, as a result, the cost <br /> of installing this well is higher then normally required for a 50-foot well. <br /> 3. Collect and test four soil samples for: <br /> • BTEX <br /> • TPH-G <br /> • MTBE <br /> • One soil sample will be tested for the oxygenate suite of MTBE, DIPE, ETBE, TAME <br /> and TBA. <br /> 4. Survey in the top of casing elevations for the new well into the existing four monitoring <br /> wells by a licensed land surveyor. <br /> 5. Perform a receptor survey to determine the presence of any domestic or production wells <br /> within 2,000-feet of the site. <br /> 6. Prepare a site characterization report evaluating the groundwater hydrogeologic data and <br /> chemical test data. <br /> 7. Perform quarterly groundwater monitoring of all wells for one year which will include: <br /> • BTEX <br /> • TPH-G <br /> • MTBE <br /> • One event for the oxygenate suite of MTBE, DIPE, ETBE, TAME and TBA <br /> • One event for EDB and 1,2-DCA. <br /> 8. Prepare quarterly groundwater monitoring reports. <br /> Proposed Bidding of Project <br /> The budget spreadsheet is attached and shows itemized costs for the proposed tasks. In an <br /> attempt to make this Pre-Approval flow smoothly, we have used the same unit costs for this <br /> work that has previously been approved by the USTCFP for other work on this project and <br /> requested bids from the subcontractors used on this project, including: <br /> • Drilling - V&W Drilling <br /> • Field support- Del-Tech <br /> V&W Drillin - We have found this company to be very cost effective in perforining its <br /> services because of reasonable charge rate, fast efficient equipment and a well trained crew. <br /> Surver" - Due to the AB 2886 Geo-Tracker requirements, GTI is working with 2 to 3 <br /> companies who believe they can accommodate our needs. The final company will be chosen <br /> once we meet with them and determine if they will be able to produce the necessary data. We <br /> have been given verbal quotes between$2,000 to $3,000. <br />