Laserfiche WebLink
gC010gical Techl cs lrte. Page 2 <br /> r Groundwater Monitoring Report <br /> Project No. 1030.2 <br /> September 30,2002 <br /> ' ( the August 2002 event was 67.72 feet above mean sea level (MSL). This is the highest <br /> groundwater elevation recorded at this site. <br /> ' Site-specific groundwater bearing and slope were calculated and found to be N 190E @ <br /> 0.0040 ft/ft. These results are consistent with historical groundwater bearing and slope for <br /> this site. <br /> Groundwater elevation, bearing and slope were calculated using data gathered from MW-2, <br /> ' MW-3 and MW-4 during the August 6, 2002, monitoring event and the results are <br /> sunnnarized in Table 1 of Appendix A. <br /> 1.2 Groundwater Sampling Procedure <br /> On August 6, 2002, Del-Tech Geotechnical Support personnel arrived on-site, opened the <br /> 1 wells and measured the depth to water with an electrically actuated sounding tape. The <br /> water level reading was recorded to an accuracy of 0.01 foot. If free floating product had <br /> been suspected, a clear disposable bailer would have been used to gauge the interface. No <br /> ' floating product was observed during this sampling event. <br /> Stagnant water in the well casing was purged using a dedicated Waterra pump. The rate of <br /> ' well purging was monitored. The well was purged of at least three casing volumes until the <br /> groundwater parameters (temperature, conductivity and pH) had stabilized (Appendix Q <br /> r indicating that water representative of actual aquifer conditions was entering the well. <br /> 1 l Groundwater parameter stabilization was characterized by three successive readings within <br /> 10%. <br /> ' Before a sample was collected, the well's water level was allowed to recharge to at least <br /> 80% of its initial level. All water removed from the monitoring well and not used as a <br /> sample was placed in a 55 gallon DOT approved container that is properly labeled and <br /> temporarily stored on-site. <br /> A dedicated Waterra pump was used to collect each sample. Extreme care was exercised <br /> while collecting samples to prevent agitation of the water contained in the Waterra pump. <br /> With minimal sample aeration, water samples were transferred from the pump into 40-m1 <br /> VOA vials preserved with hydrochloric acid. All samples were checked for headspace <br /> bubbles, labeled, inserted into foam holders and placed into a cooled ice chest for transport <br /> to the laboratory. <br /> The sampling technician wore disposable gloves while collecting all samples. <br /> A chain of custody document, listing all samples collected and their intended analyses, <br /> accompanied the samples from field to the laboratory, thereby providing a means to track <br /> the movement of and ensure the integrity of the samples. <br />