Laserfiche WebLink
s 0 <br /> LFR Inc. I <br /> 2.3 Waste Management ' <br /> The PVC casing was observed at depth by the contractor (Sukut Construction) during <br /> excavation activities. According to the contractor, the well casing was completely ' <br /> removed and was included in the Class II waste soil stockpile. The removed PVC <br /> casing and screen were crushed by the heavy equipment during excavation activities. <br /> The Class II waste soil, including the well debris, was transported for disposal at ' <br /> Forward Landfill (a licensed Class Il landfill), which is located in Stockton, California. <br /> 3.0 SUMMARY , <br /> Destruction of well MW-6 was necessary to facilitate excavation activities. The , <br /> boundaries of the excavation extended beyond the northwestern property boundary <br /> toward the abandoned railroad ]me and encompassed the location of well MW-6. The , <br /> entire well was removed on April 14, 2006, in accordance with the SJCEHD and <br /> California DWR requirements. <br /> 4.0 REFERENCE <br /> California Department of Water Resources (DWR). 1991. California Well Standards, , <br /> Bulletin 74-90 (Supplement to Bulletin 74-81). June. <br /> 1 <br /> 1 <br /> 1 <br /> rpt-welldestmct(mw6)-final-M25.dOc:LFR Page 3 ' <br />