Laserfiche WebLink
V <br /> 5.0 SCHEDULE AND REPORT OF FINDINGS <br /> Fieldwork will be scheduled to begin within one week following workplan approval by the <br /> County, and is anticipated to be completed in one day. Due to heavy business activity at the <br /> site during the week, fieldwork will be conducted on the weekend. Within six weeks <br /> following the completion of fieldwork, a site investigation report will be submitted to the <br /> County summarizing field activities and findings associated with the soil and ground water <br /> investigation. The report will include copies of pertinent laboratory reports, field sampling <br /> sheets and borehole logs. <br /> �r <br /> L.� <br /> L� <br /> L� <br /> 4 <br /> 809-001.wkp/03-06-97/ulkcydata/workplan 10 <br /> i4 <br /> ff TerraNext <br /> L <br />