Laserfiche WebLink
0 <br /> TABLE OF CONTENTS <br /> 1.0 INTRODUCTION...............................................................................................................................1 <br /> 2.0 SITE BACKGROUND........................................................................................................................1 <br /> 3.0 FIELD AND ANALYTICAL METHODS........................................................................... <br /> 3.1 HEALTH AND SAFETY REQU]REMENTS....................................................................................2 <br /> 3.2 SAMPLING PLAN.............................................................................................................................2 <br /> 3.2.1 Number, Type, and Analyses of Samples....................................... ..............2 <br /> 3.2.2 Sampling Procedure........................................................................................................................5 <br /> 3.2.3 Sample Analyses.............................................................................................. .............6 <br /> 3.2.4 Quality Assurance Measures..........................................................................................................6 <br /> 4.0 REPORTING..............................................:........................................................................................7 <br /> 5.0 SCHEDULE.................... <br /> 7 <br /> APPENDICES <br /> APPENDIX A <br /> Figure 1 —Vicinity Map <br /> Figure 2—Site Map <br /> Figure 3 —Proposed Lawn Area Sample Locations <br /> Figure 4—Proposed Lead-Based Paint Sample Locations <br /> Figure 5—Proposed Soil Vapor and PCBs Sample Locations <br /> APPENDIX B <br /> Photograph of Site Plan <br /> APPENDIX C <br /> Site Specific Health and Safety Plan <br /> APPENDIX D <br /> Proposed Sampling Scheme <br /> Analytical Methods, Laboratory Detection Limits, and PRG Values <br /> APPENDIX E <br /> Sample Labels and Chain-of Custody Form <br /> APPENDIX F <br /> Microsoft Project Schedule <br /> n <br /> 'Lip ii <br /> CONDO <br />