My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MADISON
>
701
>
2900 - Site Mitigation Program
>
PR0526001
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 10:54:12 AM
Creation date
3/5/2020 10:31:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0526001
PE
2950
FACILITY_ID
FA0017599
FACILITY_NAME
PROPOSED SPANOS ELEM SCHOOL SUSD
STREET_NUMBER
701
Direction
N
STREET_NAME
MADISON
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
701 N MADISON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' be done independently of any California Environmental Quality Act(CEQA) hearings on <br /> the Site. <br /> 6.6 Draft and Final PEA Reports <br /> ' The draft and final PEA Report will include at a minimum: background information, <br /> purpose of the investigation,an evaluation and discussion of findings in general <br /> accordance with DTSC PEA guidelines, a description of the soil types encountered, a site <br /> plan showing the boring locations, summary tables of laboratory test results,laboratory <br /> data sheets with QA/QC,chain of custody documentation, risk evaluation,any <br /> deviations,and conclusions and recommendations. The draft report will be submitted for <br /> ' DTSC review. The comments received from the DTSC will be incorporated into the final <br /> version of this report. <br /> ' 7.0 ANTICIPATED SCHEDULE <br /> Public notice of the planned fieldwork will be initiated after approval of the workplan by <br /> the DTSC. Notification to DTSC will occur at least seven days in advance of any <br /> planned fieldwork.Fieldwork will begin approximately ten days (weather permitting) <br /> after approval of this work plan by the DTSC. The field activities outlined above can be <br /> completed in three weeks (weather permitting). Laboratory analyses,data analysis and <br /> ' report preparation typically require two to four weeks to complete. Additional deeper <br /> and step out samples will take 2 weeks to sample and two weeks for analysis. Assuming <br /> an approval of this workplan by the DTSC by February 15,2006 sampling should occur <br /> ' by March 1, step out sampling would be completed by April 10, a final data analysis <br /> completed by April 24, and a report prepared by May 22,2006. Prior to any fieldwork <br /> occurring at the Site,an electronic copy of the fieldwork notice that will be posted at the <br /> Site 10 days prior to sampling will be sent to and approved by the DTSC. <br /> 8.0 SIGNATURES OF QUALIFIED PROFESSIONALS <br /> ' This report has been prepared under the direct supervision of the professional whose <br /> signature is below. Any further questions or comments can be directed to Aperio Inc. at <br /> (209)728-3075 or through email at david.k.wood@comcast.net. <br /> Respectfully submitted, �`SSERED GFO�o <br /> Qr DAVID K. W G� <br /> ER 8020pD a // <br /> • CERTIFIED C� <br /> ' N (4 /� HYDRO r <br /> `{�• � � GEOtOGISi �P l <br /> David K.Wood OF CA IFGJim Roehl <br /> ' California Professional Geologts Environmental Technician <br /> Certified Hydrogeologist#802 <br /> tPEA Workplan 23 <br /> Spanos Elementary School <br /> January 18,2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.