My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
114
>
2900 - Site Mitigation Program
>
PR0537059
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 11:03:22 AM
Creation date
3/5/2020 10:35:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0537059
PE
2950
FACILITY_ID
FA0021268
FACILITY_NAME
SACRAMENTO VALLEY LMTD PRTNRSHP DBA VERIZON WIRELESS
STREET_NUMBER
114
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04308411
CURRENT_STATUS
01
SITE_LOCATION
114 N MAIN ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• vu v�� • <br /> s ' <br /> m m <br /> SJCEHD Page 2 <br /> May 3, 2012 Project Number 33111-011034.01 <br /> conduit. The conduit will extend north, and then south to the existing Verizon Wireless equipment shelter. <br /> Soil disturbed may require offsite disposal. <br /> SCOPE OF WORK <br /> A fuel above ground storage tank (AST)of unknown content, capacity, age and construction is currently <br /> present in the eastern portion of the subject parcel. In addition, several fuel storage tanks have been <br /> historically used on the subject parcel. A 350-gallon diesel underground storage tank (UST)located on <br /> the western portion in close proximity to the subject property was filled with slurry and abandoned in place <br /> in 1987. On the eastern portion, a 250-gallon waste oil UST, 1,000-gallon diesel UST, and 2,000-gallon <br /> gasoline UST were installed in 1940. The diesel and waste oil USTs were removed in 1987 and the <br /> gasoline UST was removed in 1993. A closure letter was issued for the gasoline UST removed in 1993; <br /> associated analytical data did not indicate impacts. No closure letter or sampling results were found for <br /> the waste oil or diesel USTs. The lengthy use of various fuels on the subject parcel with limited <br /> documentation regarding potential impacts that could affect the subject property indicates a potential <br /> concern <br /> TASK 1: PRE-FIELD ACTIVITIES <br /> Bureau Veritas will obtain the appropriate drilling permit from the San Joaquin County Environmental <br /> Health Department(SJEHD). The SJEHD requires a permit fee and on site grout inspector to be present <br /> during abandonment activities and requests a copy of the completed report. In addition, the completed <br /> Master File Record Information Form and Boring permit application are appended. <br /> Bureau Veritas prepared a site specific Safety and Health Plan (SSHP)to reflect the proposed work at the <br /> subject property. The SSHP details the work to be performed, safety precautions, emergency response <br /> procedures, nearest hospital information, and onsite personnel responsible for managing emergency <br /> situations. A copy of the SSHP is appended. <br /> Bureau Veritas will mark the subject property with white paint and contact Underground Service Alert <br /> (USA)at least 48 hours prior to conducting the field activities. In addition, Bureau Veritas proposes to <br /> utilize a private utility locating service to clear boring locations prior to conducting field activities. Bureau <br /> Veritas will not penetrate the subsurface within three feet from a known underground utility <br /> TASK 2: FIELD ACTIVITIES <br /> Upon clearance of utilities, Bureau Veritas will contract with licensed C-57 drilling contractor to complete <br /> the proposed investigation using truck-mounted direct-push (Geoprobe)equipment to advance the <br /> borings. Three borings(BV-1 though BV-3)will be advanced in the vicinity of the proposed generator. <br /> BV-1 through BV-3 will be advanced to approximately 5 feet bgs. The proposed boring locations are <br /> shown in Figure 1. The exact boring location will be based on access restrictions, identified subsurface <br /> utilities, and encountered field conditions. <br /> Soil Logging and Sampling <br /> Bureau Veritas will attempt to collect soil samples from the borings at intervals to the total depths drilled <br /> for the purposes of soil classification. However, due the shallow depth, boring logs will not be generated. <br /> Work Plan Central Lodi <br />
The URL can be used to link to this page
Your browser does not support the video tag.