Laserfiche WebLink
"Okeical Technics!ne Page 5 <br /> Groundwater Monitoring Report <br /> Project No 662 2 <br /> September 24, 2003 <br /> ' monitoring well installation, and groundwater extraction well installation and aquifer <br /> testing GTI submitted our January 17, 2003 work plan to meet the SJC/EHD directives <br /> ' and they approved the CPT and groundwater extraction well portion of the work plan to <br /> their February 14, 2003 letter This work will be performed as soon as county and city <br /> pen-nits are secured <br /> t <br /> ' 3.0 LIMITATIONS <br /> This report was prepared in accordance with the generally accepted standard of care and <br /> ' practice in effect at the time Services were rendered It should be recognized that definition <br /> and evaluation of environmental conditions is an inexact science and that the state or <br /> practice of environmental geology/hydrology is changing and evolving and that standards <br /> existing at the present time may change as knowledge increases and the state of the practice <br /> continues to improve Further, that differing subsurface soil characteristics can be <br /> experienced within a small distance and therefore cannot be known in an absolute sense <br /> ' All conclusions and recommendations are based on the available data and information. <br /> The tasks proposed and completed during this project were reviewed and approved by the <br /> local regulatory agency for compliance with the law No warranty, expressed or implied, is <br /> made <br /> ' 4 0 SIGNATURES AND CERTIFICATION <br /> If you have any questions or of we can be of further assistance, please do not hesitate to <br /> contact our office at 209-522-4119 <br /> ' This report was prepared by <br /> ' Joseg I Angulo <br /> Geologist <br /> 000 <br /> ' a i Ka�etnNon�r w <br /> Raynold I Kablanow II, Ph D ,r NO d <br /> ' California g <br /> Registered Geologist #5234 <br /> g <br /> Certified Hydrogeologist #442 <br />