Laserfiche WebLink
cwtogtcal reclmaW Page 5 <br /> Feasibility Study&Investigation Work Plan <br /> Cardoza(Main St) <br /> Project No 662 2 <br /> Apn1 19,2004 <br /> ' • Benzene, Toluene, Ethyl Benzene and Xylene (BTEX) by EPA method 8020 <br /> Total Petroleum Hydrocarbons as Gasoline (TPH-G)by EPA method 5030/8015(M) <br /> ' • Total Petroleum Hydrocarbons as Diesel (TPH-D)by EPA method M8100 <br /> • Oxygenated Fuel Compounds (MTBE, DIPE, ETBE, TAME & TBA) by EPA method <br /> ' 8260 <br /> • 1,2 DCA, EDB and ethanol by EPA method 8260 <br /> • Methanol by EPA method 8015 <br /> ' + Lead by method 6010 <br /> ' 3.0 SOIL VAPOR/GROUNDWATER EXTRACTION WELL <br /> Extraction well EW-1 was installed on December 12, 2003 to facilitate an aquifer pumping <br /> test But unfortunately the screened interval of this well (37 -- 50 feet bgs) will not allow <br /> vapor extraction to address shallow soils at the site GTI proposes installing a second soil <br /> ' vapor/groundwater extraction well to address the shallower residual soil contamination <br /> beneath the former UST excavation <br /> ' 3.1 Extraction Well Installation <br /> A soil vapor/groundwater extraction well, EW-2, will be placed in the former UST <br /> excavation Figure 5 includes the proposed well boring location Prior to commencing <br /> work, soil boring/monitoring well permits will be secured and the SJC/EHD will be notified <br /> 48 hours in advance The subsurface will be cleared of underground utilities by notifying <br /> Underground Service Alert <br /> ' The boring will be drilled using a 10-inch outside diameter continuous flight hollow stem <br /> auger and will be advanced to a depth of 32 feet below the ground surface (bgs) The <br /> extraction well will be constructed using schedule 40 PVC casing with flush threads <br /> ' Before installing the bentonite seal the well will be surged using a clean surge block or <br /> bailed with a steel bailer to achieve maximum filter pack density A granular bentonite <br /> transition seal will be installed above the sand filter pack and hydrated with clean tap water <br /> A surface seal will be achieved by pumping a neat cement grout (augmented with < 4% <br /> ' bentonite) through the augers, as they are withdrawn to ensure that an integral grout seal is <br /> achieved The well will be secured with locking watertight cap and encased in flush <br /> mounted traffic rated well box Soil cuttings will be containerized in DOT approved 55- <br /> gallon steel drums and held on site pending disposal <br /> This well will be constructed as outlined in the table below <br /> ' —Well No. ia. creen of an ac rans. rout Seal <br /> Seal <br /> M--sand - - 18'-surface <br /> Screen Selection Rationale <br /> Figure 6 is a cross section of the subsurface on a southwest-northeast trend across the site <br /> ' Proposed extraction well EW-2 has been projected onto the cross section in the vicinity of <br /> the former UST excavation (proposed monitoring well MW-5 is also shown on the right side <br /> of the diagram near CPT-7) The screened interval of the well will just penetrate the <br /> groundwater table that was recorded at approximately 29 feet bgs in November 2003 Once <br />