Laserfiche WebLink
' 0 0 <br /> yeofogicalTeckwsW Page 6 <br /> Feasibility Study&Investigation Work Plan <br /> Cardoza(Main St) <br /> Project No 662 2 <br /> lie Apnl 19,2004 <br /> ' groundwater extraction starts the water table drawdown will leave the screen dry and then <br /> vapor extraction will be applied to the fine grained sediments beneath the former <br /> ' excavation The top of the screened section at 22 feet bgs leaves enough buffer distance so <br /> that the vapor extraction does not immediately short circuit straight up into the excavation <br /> fill <br /> ' 3.2 Extraction Well Development <br /> After the well sealing materials have set (>24 hours) the new well will be developed (using <br /> mechanical surging and pumping methods) until a clear stream of water is obtained All <br /> ' development and purge water will be containerized in 55 gallon DOT approved containers <br /> and stored on site until their disposition can be arranged <br /> ' 4.0 DUAL PHASE EXTRACTION TEST/FEASIBILITY STUDY <br /> Soil vapor extraction and groundwater extraction are two proven technologies for the <br /> ' remediation of gasoline impacted sites Dual phase extraction involves the use of both <br /> technologies simultaneously from one well - extracting groundwater induces a cone of <br /> depression that exposes more impacted soil to vapor extraction For the purpose of this <br /> ' pilot test, GTT proposes to utilize a mobile treatment unit for a period of one week <br /> Extracted vapors will be treated with a thermal oxidizer and groundwater will be hauled off <br /> site for disposal <br /> 4.1 Dual Phase Extraction System <br /> The general process for dual phase extraction is as follows <br /> ' ■ Extract vapors and water using a liquid ring vacuum pump <br /> ■ Separate the influent vapors and water in a portable vacuum tank <br /> ■ The contaminated vapor is then oxidized in a thermal oxidizer <br /> ' ■ The captured contaminated groundwater is transferred to a tanker truck trailer via a high <br /> vacuum pump The tank trailer will be emptied at regulator intervals by a licensed <br /> hauler for transportation to a waste disposal facility <br /> ' = Collect data for actual vacuum flow and contaminant concentrations and temperature <br /> ■ Delineate the area of influence from the applied vacuum and groundwater draw down <br /> through use of observation wells <br /> ' Note Three bids will be requested from dual phase equipment contractors in accordance <br /> with UST Cleanup Fund (USTCFP) requirements <br /> ' 4.2 Dual Phase Extraction Test <br /> GTT proposes conducting a 5-day pilot test utilizing existing well EW-1 and proposed <br /> ' extraction well EW-2 <br /> To optimize the pilot testing process, we propose to perform two separate tests using the <br /> ' dual phase equipment The tests will include <br /> 1 Vapor Extraction Test - measuring vacuum influence at surrounding monitoring <br /> wells to determine the effectiveness of soil vapor extraction for vadose zone <br /> 1 <br />