Laserfiche WebLink
GeolagualTecknuslnc. Page 11 - - <br /> Interim Remedial Action Plan <br /> Project No.622.2 <br /> March 28,2005 <br /> { <br /> 6.0 SIGNATURES AND CERTIFICATION <br /> It is expedted that this project will be performed in accordance with current professional <br /> standards and acgepted geologic and hydrologic standards of the State of California accepted <br /> and in effect at the time of this investigation. Geological Technics Inc. is not responsible for <br /> undisclosed conditions. <br /> r This work plan was prepared by: <br /> Joseph Df ulo <br /> AL <br /> Geologi 'c.`'S,ON {'�c0 <br /> O O <br /> CL R.I.KABLANOW it ; <br /> NO.5234 • <br /> Raynold I. Kablanow H, Ph.D. <br /> California Professional Geologist#5234 OF O <br /> g CAt�1F <br /> California Certified Hydrogeologist#442 <br /> f <br /> E <br /> F <br /> L ' <br /> E <br />