My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
224
>
3500 - Local Oversight Program
>
PR0545393
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 1:56:50 PM
Creation date
3/5/2020 1:22:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545393
PE
3528
FACILITY_ID
FA0005072
FACILITY_NAME
DIAMOND LUMBER INC
STREET_NUMBER
224
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04308301
CURRENT_STATUS
02
SITE_LOCATION
224 N MAIN ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IV . STRUCTURE INSPECTION <br /> On Au ust 14 1989 an inspection of the structure was conducted <br /> g p <br /> at the subject site . BEI _did ' not review any drawings , prepare any <br /> calculations or do any testing of 'bui-l-ding materials to determine <br /> their structural capacities . <br /> All buildings on this site are in use , and in serviceable <br /> condition . There is 'no evidence of ma 'Jo°r problems with the <br /> structure . However , the following conditions were noted and <br /> should be investi,gated. by a structural engineer : <br /> 1 . The building columns. at the east end , of building 1 are <br /> damaged and iri .need 'of, repair . <br /> 2 . The,' columns holding up the lean-to on 'the east end of the <br /> north side of the main building are damaged and in need of <br /> repair . <br /> 3 . Of sixteen, columns in the main part of the bulding-, one has <br /> been removed to facilitate lumber storage . The new spans <br /> seem to be properly supported . . <br /> 4 . - A number of support columns were removed from building 2 . <br /> It does not appear that the structure is effected , however , <br /> a determination of the load carrying capacity should be made <br /> 4 and the area posted accordingly . <br /> - 8 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.