Laserfiche WebLink
Y�1r <br /> 3 E - ' <br /> k <br /> Mardee Kidd <br /> Page 2 <br /> Quarterly monitoring and reporting are minimum reporting requirements. <br /> Quarterly sampling of the existing monitoring:well should be scheduled no later <br /> than September 25, 1992 with the resultant quarterly report due October 30, 1992. <br /> Prior to sampling events, please contact PHS/EHD, 48 hours in advance...: <br /> PHS/EHD inspections of sampling events are jan important aspect of local - <br /> regulatory oversight, as referenced in the'leaking Underground Fuel Tank <br /> (LUFT) manual prepared by the State Water iResources Control'Board'. <br /> Finally, please be informed that reports, work plans and letters are to be submitted both <br /> to PHS/EHD and the Central Valley Regional Water Quality Control Board <br /> (CVRWQCB) until clean up is deemed adequate for:closure. <br /> If you have any questions, comments, or to schedule a'site inspection, please contact <br /> Mary Meays, REHS, of my staff at (209) 468-03.37. <br /> Jogi Khanna, ., M.P.H. <br /> Health 4 er� <br /> carie A. Cotulla, REHS, Program Manager <br /> Environmental Health Division <br /> LAC/MM1 <br /> i <br /> c: Elizabeth Thayer, CVRWQCB 4 <br /> c: Bruce Scarbrough, Seacor Environmental'' <br /> L <br /> `E ' <br />