My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
2500
>
3500 - Local Oversight Program
>
PR0545420
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 5:33:06 PM
Creation date
3/5/2020 4:20:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545420
PE
3528
FACILITY_ID
FA0003815
FACILITY_NAME
TESORO (SPEEDWAY) 68154
STREET_NUMBER
2500
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
02740006
CURRENT_STATUS
02
SITE_LOCATION
2500 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 U <br /> f <br /> CHRONOLOGY <br /> 2500 LODI AVE. <br /> LOP SITE CODE: 1 356 <br /> APN: 02704004 <br /> CVRWQCB CASE # 390096 <br /> E <br /> 03/05/87 Due to an environmental assessment request, four soil borings were drilled, two <br /> borings were grouted (SA, SB) and the other two were made into monitoring <br /> wells (S-1, S-2) on this date. Soil and groundwater contamination were reported. <br /> 03/16/87 A "Preliminary Site Assessment Report" was submitted to the Environmental l <br /> Health Department (EHD) on this date that detailed the work performed in March <br /> 1987. <br /> 08/12/87 On this date three more monitoring wells (MWI through MW3) were installed. <br /> 10/13/87 A "Delineation Report" was submitted to the EHD on this date that detailed the <br /> August 1987 work. <br /> 01/20/89 On this date monitoring wells MW4 through MW7 were installed. <br /> 05/13/91 EHD placed the site in Local Oversight Program and sent a Notice of <br /> Responsibility to USA'Petroleum, the responsible party. ' <br /> 02/08/93 On this date monitoring well MW8 was installed. <br /> 03/14/95 On this date a soil vapor extraction test was performed on monitoring wells S-1, <br /> S-2, MW3, and MW8. - r <br /> 04/17/95 The date of "Results;of Pilot Test for Vapor Extraction" that summarizes the <br /> vapor extraction test performed in March 1995. <br /> 1016-7197 Three gasoline underground storage tanks and piping were removed from the <br /> site, excavation and disposal of 500 cubic yards of contaminated soil from the <br /> UST area occurred and sampling was performed beneath the piping and in the <br /> excavation. <br /> 10/22/97 The date of the "Soil Excavation and Product Line Sampling" report discussing <br /> the October 1997 work. <br /> 01/26/99 The date of the-"Remedial Action Plan" that proposed remediation of the site. <br /> 05/4-5/00 On this date air sparge well ASI, monitoring wells MW9, and MW10 were <br /> installed and MW5 was destroyed. A report of this work was prepared in May <br /> 2000. <br /> 08/10/00 A public notice was posted at the site on this date for the planned remediation of <br /> soil vapor extraction and air sparging (SVE/AS). <br /> i <br /> y <br /> x <br />
The URL can be used to link to this page
Your browser does not support the video tag.