My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
2500
>
3500 - Local Oversight Program
>
PR0545420
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 5:33:06 PM
Creation date
3/5/2020 4:20:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545420
PE
3528
FACILITY_ID
FA0003815
FACILITY_NAME
TESORO (SPEEDWAY) 68154
STREET_NUMBER
2500
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
02740006
CURRENT_STATUS
02
SITE_LOCATION
2500 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Chronology Page 2 <br /> 2500 Lodi Ave. <br /> Lodi, CA <br /> 08/15/00 Corrective Action using SVEIAS began on this date and continued until April <br /> 2006. <br /> 05/02/01 Vapor extraction well VW1 was installed on this date. <br /> I <br /> 08/29/01 The date of"Second Quarter 2001 Report" that discusses the installation of VW1. I <br /> 12/27/05 The date of the Site Conceptual Model prepared for this site. <br /> 04/30/06 On this date the remediation system was shutdown and rebound testing was <br /> proposed. <br /> l <br /> i <br /> 6120-28106 During this period seven soil borings (CB1, CB2, CB3, CB4, CB4A, C13413, CB5) <br /> and two cone pentrormeter test points (CPT1, CPT2) were completed. All results <br /> for the soil samples collected were non detect. <br /> 11/16/06 The date of "Post Remediation Site Assessment Report" that discusses the June <br /> 2006 work. <br /> 04/21/08 Due to low concentrations of dissolved gasoline remaining in monitoring well <br /> MW3, a dual phase pilot test was completed on MW3. All ground water and soil <br /> vapor results were below detection limits. <br /> 06/16/08 The date of"Dual Phase Extraction Pilot Test Report" discussing work performed <br /> in April 2008. <br /> 08/28/08 The date of the "No Further Action Request" report prepared by Stratus <br /> Environmental for the site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.