My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
2500
>
3500 - Local Oversight Program
>
PR0545420
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 5:33:06 PM
Creation date
3/5/2020 4:20:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545420
PE
3528
FACILITY_ID
FA0003815
FACILITY_NAME
TESORO (SPEEDWAY) 68154
STREET_NUMBER
2500
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
02740006
CURRENT_STATUS
02
SITE_LOCATION
2500 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k..' *..W <br /> CONSTRUCTION AND INSTALLATION OF REMEDIATION SYSTEM <br /> USA Service Station No.65 <br /> 2500 West Lodi Avenue, Lodi, California <br /> DESCRIPTION OF WORK <br /> USA Station No. 65 is an active gasoline retail service station located at 2500 West Lodi <br /> .Avenue, Lodi, California. Soil and groundwater at the site are impacted with petroleum <br /> hydrocarbons. A soil vapor extraction system is to be installed to impact to soil and <br /> groundwater in the capillary fringe. The following represents the major scope items of <br /> the proposed construction activity. <br /> 1. Convert three onsite 4-inch monitoring wells S-1, S-2 and MW-8 to soil vapor <br /> extraction wells. See Sheet C-1 and Sheet C-3. Wells S-1 and S-2 are screened <br /> from 28 feet to 48 feet bgs. MW-8 is screened from 35 to 55 feet bgs. Depth <br /> to water (average—2"d quarter) at the site is 39 feet bgs. <br /> 2. Connect the three vapor extraction wells to the Stealth catalytic oxidizer, rated <br /> at 150 cfrn(provided by Stratus). See Sheet C-2. <br /> 3. Convert air sparge well and stub up the piping in system enclosure. The <br /> sparge will not be connected to the piping manifold. <br /> 4. Install a 25-foot temporary power pole per City of Lodi specifications (see <br /> attached) and details provided on Sheet E-1. <br /> 5. Provide power to the unlit from the temporary power pole. <br /> 6. Provide instrumentation to operate system. See Sheet M-1. <br /> CONSTRUCTION NOTES <br /> These notes are to be used along with the design drawings. Please forward all manuals <br /> and warranty information to Stratus for instrumentation purchased b Contractor. <br /> Contractor is responsible for removal of all debris from the site after the job is complete. <br /> Contractor to conduct business in a neat and professional manner. <br /> 1.0 Trenching and Piping <br /> See Sheets C-1 and C-3 <br /> Contractor to ensure safety of product and vent piping in the vicinity of the pump islands <br /> and USTs. Contractor to locate all utilities before initiating construction activity. Please <br /> find attached as-built figure for the location of vent lines and product piping for your <br /> review. <br /> Use hand digging within 3-feet of product piping. <br /> C_My Documents\USA\65\Consuxuado specs.doc Stratus <br />
The URL can be used to link to this page
Your browser does not support the video tag.