My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
2500
>
3500 - Local Oversight Program
>
PR0545420
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 5:33:06 PM
Creation date
3/5/2020 4:20:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545420
PE
3528
FACILITY_ID
FA0003815
FACILITY_NAME
TESORO (SPEEDWAY) 68154
STREET_NUMBER
2500
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
02740006
CURRENT_STATUS
02
SITE_LOCATION
2500 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor to provide traffic control at the pump islands during trenching activity to <br /> ensure safety of USA customers. <br /> All. trenches should be completed to match exiting surroundings (concrete/ asphalt or <br /> dirt). Stratus is responsible for the disposal of dirt from the trench excavation. Contractor <br /> to stockpile all dirt on visqueen and cover with visqueen on site. Stockpile area will be <br /> identified during site meeting. <br /> Contractor to saw cut, trench and install subgrade piping to vapor extraction wells. All <br /> piping shall be schedule 40 PVC for subgrade and schedule 80 PVC for above ground <br /> piping. <br /> Sub-grade piping shall have a gentle slope (1/16") towards the well to drain condensate <br /> back to the well. <br /> Each wel3 shall have a home run back to the system enclosure and manifold. All piping <br /> shall be vacuum tested. Vacuum test to consist of maintaining a 3-prig vacuum for not <br /> Jess than one hour. <br /> 2.0 Wellhead Conversion <br /> See Sheet C-3 <br /> x <br /> Contractor to procure and. install 4 well boxes. Please ensure that wellhead elevations are <br /> not impacted by conversion. <br /> 3.0 System Enclosure <br /> Please review Sheet C-2 for equipment layout and placement details. <br /> Contractor to mount one l 0-B:C. 10 pound carbon dioxide, fire extinguisher on inside of <br /> fence, adjacent to gate. <br /> Piping Manifold and Instrumentation <br /> See Sheet C-2 and M-I. <br /> The three vapor extraction wells should be stubbed up to a piping manifold. Contractor <br /> to procure and install all instrumentation. <br /> Contractor to provide unistrut support to the Manifold. <br /> Construction of the Manifold is to be based on details provided in Sheet M-I. <br /> System Installation <br /> Contractor to anchor the trailer mounted catalytic oxidizer unit to the asphalt surface. <br /> See Sheet C-2. Anchors to be placed such that they do not constitute a tripping hazard. <br /> C:INIy Documents\USA165\Constructio specs.doc stratus <br /> I <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.